SAP中MRP类型 P1,P2,P3,P4,PD的区别 由于MRP type设置中firm type的不同,所以MRP type产生的plan order的固定方式不同 p1 自动固定firm period之前的plan order,生成新的plan order排在firm period之后 p2 自动固定firm period之前的plan order,不生成新的plan order p3 不固定firm period之前的plan order,生成...
SAP中MRP类型P1,P2,P3,P4,PD的区别由于MRP type设置中firm type的不同,所以MRP type产⽣的plan order的固定⽅式不同 p1 ⾃动固定firm period之前的plan order,⽣成新的plan order排在firm period之后 p2 ⾃动固定firm period之前的plan order,不⽣成新的plan order p3 不固定firm period之前的...
Try to do with MRP type PD, P1, P2 etc than D1. Regards PR former_member676656 Explorer 2020 May 06 11:21 AM 0 Kudos Thanks pullaraot for your quick responses. Unfortunately I am facing the issue ' There are no reference top-level demands in reference ID XXXX...
1) In case of P1/WB, if my planning time fence is 5 days, when i run MRP today, what would be the result, if i have a sales order delivery requirement for tomorrow? 2) In the same above situation, if my sales order requirement for 7th day from today, what would be mRP result?
在SAP系统中,将物料分为自产和外购,通过物料主数据MRP2视图的Procurement type标识,Procurement type分4种情况: E:In-house production->表示该物料主要是自产,如果外购回出现ME092的警告消息;MRP跑出后出现生产计划->生产工单;自产料在成本估算时如系统没有找到BOM,默认会给一个错误提示(可以忽略关闭这个消息) F:...
*if you use SAP APO for planning, you can use MRP type X0(no MRP in SAP R/3,but BOM explosion) to select the APO-relevant materials. 12、planning time fence *planning time fence (MRP 1 view) - the range of a MRP run is defined by the planning time fence. ...
Firming type 1- P1 or M1. The date of new order proposals that are actually created in the planning time fence are rescheduled out to the end of the planning time fence. Therefore, these new order proposals are not firmed. Firming type 2- P2 or M2: The system does not create any new...
MRP一般是由于MPS引起的,比如你有一个部件A MRP type=M0(MPS部件),它下面一个子部件B MRP TYPE=PD(MRP部件)。系统跑MPS的时候,只跑A部件,然后算出A的PL ORDER,然后产出对B的DEPENDENT REQUIREMENT,然后系统跑MRP(当然对B了),系统根据那个DEPENDENT REQUIREMENT,跑出对B的需求; MRP有三种: 1、MPS-MPS包含(M0...
In our Project, APO is planning all materials and sending Planned orders/Production orders (Since SNP/PPDS are there). So one user complaining that a Planned order basic dates goes wrong. Query is whether MF50 Planning table can create Planned orders in spite of MRP type X0?? If so, Mat...
4.3物料类型与分类 4.3.1物料类型 物料类型(item type)最基本的作用是在编制计划时,说明物料是如何形成 的,即自制还是外购,也就是物料的来源。MRP展开时根据物料类型,决定对该 物料生成加工计划还是采购计划。此外,物料类型还要说明物料在计划中的特征, 如选择装配中的基本组件和可选件、配套出售件(kitting,如根据...