All Articles in ETCS L2 21 kwi 2021 Alstom, Thales and Nokia consortium completes high-speed signalling upgrade for Poland Complex signalling upgrade enables implementation of 200 km/h service on E65 railway line . Defence and Security Digital Identity and Security Aerospace Space ...
阿尔斯通为斯柯达列车部署ETCS L2系统 10月15日,阿尔斯通与斯柯达签订ETCS L2增补合同,在斯柯达为捷克运营商RegioJet供应的15列两编组列车和8列三编组列车上部署ETCS L2系统,预计交付时间为2025年上半年。 此次合作是在双方现有合作基础上的进一步深化,旨在提升铁路运输的安全性、效率以及整体运营能力。ETCS作为欧洲标准化...
ETCS level 2OpenTrackThis paper presents an analytical-based methodology that computes the optimal length of block sections and the marker boards' location following headway requirements, with the lowest amount of signalling equipment, for an ETCS L2 railway networks. It is applied to the Danish F...
The invention relates to an arrangement for etcs l2 – european train control system level 2 – train control of the workpiece with actuating controlled rbc – radio block center – (6) on the basis of a itself block - system with between the signal boxes (3) arranged, of track free ...
本发明涉及一种用于ETCS L2(欧洲列车控制系统2级)列车控制的装置,具有信号塔控制的RBC(无线闭塞中心)(6),所述装置基于带有在信号塔(3)之间布置的,由轨道空闲指示设备(4)控制的闭塞信号(1)的自动闭塞系统.为了能够尽量低成本地将自动闭塞路段改建成ETCS-路段,进行了以下设置:将轨道空闲指示设备(4)和/或闭塞信号...
The invention relates to an arrangement for European Train Control System Level 2 (ETCS L2) train control, comprising Radio Block Centers (RBCs) (6), which are controlled by signal boxes and are based on an automatic block system, comprising block signals (1) arranged between the signal boxes...
本发明涉及一种用于ETCSL2(欧洲列车控制系统2级)列车控制的装置,具有信号塔控制的RBC(无线闭塞中心)(6),所述装置基于带有在信号塔(3)之间布置的,由轨道空闲指示设备(4)控制的闭塞信号(1)的自动闭塞系统.为了能够尽量低成本地将自动闭塞路段改建成ETCS-路段,进行了以下设置:将轨道空闲指示设备(4)和/或闭塞信号(...
D. Emery: "Enhanced ETCS L2/L3 train control system", in Advanced Train Control Systems, B. Ning, Ed. WIT Press, pp.113-122 (2010)Emery, D. : ‘ Enhanced ETCS_L2/L3 train control system ’, in Ning, B. (Ed.) : ‘Advanced train control systems’ ( WIT Press , 2010 ), pp....
In order to increase the signaling safety during ETCS train control, according to the invention on the part of the RBC, an MA updating block or an MA repetition block for an MA allocated to an L2 train (Z1, Z2) delays the departure or onward travel of a train (Z1, Z2), despite ...
In order to increase the signaling safety during ETCS train control, according to the invention on the part of the RBC, an MA updating block or an MA repetition block for an MA allocated to an L2 train (Z1, Z2) delays the departure or onward travel of a train (Z1, Z2), despite ...