is an international leader in developing and maintaining Control-Command and Signaling (CCS) and Traffic Management System (TMS) solutions for railway and mass transit systems, ranging from standalone interlock
In a further ETCS project, a fully digital integration of ETCS into the interlocking should therefore be implemented together with a consistent simplification of trackside light signalling. The existing ETCS architectures were to be significantly further developed and technical optimisation potential ...
India starts first ETCS project
It is applied to the Danish Fjernbane Infrastructure East project, which aims at replacing the existing signalling system with a new one based on ETCS Level 2. Starting from track layout, rolling stock information and headway scenario, and knowing the trains features, an easy backward calculation...
ETCS level 2 (ETCS L2), ETCS L1 is a variant where transmission of the movement authority (MA) from the track-side to the train is point-to-point using balises. Similarly, all other information is also transmitted in the same way. There is no RBC in this ETCS application configuration....