of movement.The process for the repair of rigid pavement on the section of location of the movement-expansion joint consists in that along the joint line under the slabs is made a recess of the layer/layers of the base and the working layer of the roadbed with the formation of a tunnel...
1.The equal settlement section of rigid pile with cap composite foundation has been proved.带帽刚性桩复合地基在一定深度位置处存在等沉面现象,为建立带帽桩复合地基沉降计算模型提供了理论依据,并为设计提供有益指导。 2.Based the on soil mechanics,elastic theory and some reasonable assumptione,adopting ...
1. The equal settlement section of rigid pile with cap composite foundation has been proved. 带帽刚性桩复合地基在一定深度位置处存在等沉面现象,为建立带帽桩复合地基沉降计算模型提供了理论依据,并为设计提供有益指导。2. Based the on soil mechanics,elastic theory and some reasonable assumptione,...
aAircraft Classification Number(ACN)-Rigid Pavement 航空器分类数字(能) -刚性路面 [translate] abecause they feel that they become servants of the clock 因为他们认为他们适合时钟的仆人 [translate] aNo, another damn 不,另一该死的 [translate] a不知道什么时候才能拥有一个温暖的家 Did not know when ...
aThe beneficial owner is not an individual, derives the item (or items) of income for which the treaty benefits are claimed, and, if 收益人不是个体,不获得 (条约) 好处被要求收入的项目或项目,和,如果[translate] apavement 路面[translate] ...
11.Application of GIS in Urban Vertical Design:Road Longitudinal Section Design and Calculation of Earthwork VolumeGIS在城市竖向设计中的应用——道路纵断面设计与土方工程量计算 12.On Reconstruction Method of Old Rigid City Road Pavement;浅析城市道路旧刚性路面的改造方法 ...
Theoretical Analysis of Reflective Cracking in Asphalt Pavement with Semi-rigid Base Reflective cracking in semi-rigid base asphalt pavement is one of the major pavement diseases, and the main purpose of this study is to explore the cause o... Y Gao - 《Iranian Journal of Science & Technology...
Influence of Shear Deformations on the Buckling of Reinforced Concrete Elements When constructing design diagrams of reinforced concrete bearing systems of buildings and structures using a bar or plate analogy between structural elements and their models, as a rule, absolutely rigid adhesion of reinforceme...
The vehicle body and all wheels are assumed as rigid bodies with corresponding mass, while the spring and the damper are linear. Then the vehicle equation can be given by: [ ] + [ ] + [ ]{ } = { }, (5) in which the { } denotes the load vector induced by the bridge, [ ],...
FIELD: mining.;SUBSTANCE: invention relates to mining and can be used during forming of hydraulic-mine dumps for wastes storage. The method of buildup of small-section dam of sludge storage comprises routing of discharge 9 and distribution 10 pipelines, the sludge storage filling with sludge 1....