06 PPAP尺寸测量报告 Dimensional Report 供方:检验机构名称:生产件批准--尺寸测量报告 零件编号:零件名称:项目 尺寸/规范 数量 特殊特性 供方测量结果 合格不合格 结果:检验员:合格 批准:不合格日期:
PPAP Sample Submissions--Dimensional Test Results 供应商/ORGANIZATION:: 零件号/PART NUMBER: 供方/卖方代码/SUPPLIER/VENDOR CODE: 零件名称/PART NAME: 检测机构名称/INSPECTION FACILITY: 设计变更级别/DESIGN RECORD CHANGE LEVEL: 工程变更文件/ENGINEERING CHANGE DOCUMENTS:相关...
5.PPAP提交时机 6.PPAP提交等级 7.PPAP提交状态 8.PPAP记录的保存 2022/2/1 2 什么是PPAP 顾客对供应商的产品、生产条件、生产过程等方面的书面约定与认可。2022/2/1 3 PPAP认可的目的 确定供方是否已经正确理解了顾客工程设计记录和规范的所有要求,并且在执行所要求的生产节拍下的实际生产过程中,具有持续满足...
PPAP Excel Template with worksheets for the following elements: 4 DFMEA 5 Process Flow Diagram 6 PFMEA 7 Control Plan 8 Gauge R&R 9 Dimensional Results 10 Material Tests 14 Appearance Approval Report 18 Part Submission Warrant Checklist of all 18 elements ...
* * ISO/TS16949系列培训教材 VOC: Customer Special Requirements and Specification Special Characteristics of Product and Process Control Plan SOP/SIP Process Flow Chart PFMEA Check Aids SPC Design Records Product Spec DFMEA ECR Management PPAP Release DVPR Test Design Validation Plan Report Dimensional ...
When reporting on the dimensional results of a True Position, and/or Profile, GD&T requirement, also report the dimensional results for the Basic Dimensions that are associated with F1021_PPAP_checksheet_ instructions Revision Date: November 6, 2014 Page 3 Global Supply Management the GD&T ...
measurementvalueandresults(ok/notok).Dimensionalvaluesrecordedforallfeaturesandnoteswherepossible.Minimumofonepiecesamplefromeachprocessflow(machine/cavity/mould/fixture/etc).MATERIAL/PERFORMANCETESTRESULTSTestreportindicatingcompliancewithDdesignrecordandrelatedengineeringspecification.GAGER&RSTUDIESGageR&RTemplate(Global...
Template/Example标准格式标准格式/样本样本PPAP Document Submission Requirement Introduction PPAP文件提交要求介绍8. Full Dimensional Report 全尺寸报告Requirement description 要求描述要求描述对PPAP试生产得到的零件状态进行监控,抽取6件进行全尺寸测量;多模腔零件,3件/穴。1.总成件类尺寸,子零件全尺寸报告遵循上述原则...
Fast To Market = Need to submit PW, Balloon Drawing,Dimensional Result (5 Sample FAI), Material Report, RoHS Report at the initial submission to get Interim Approval For Full approval - Other Documents identified as "S" per PPAP level shall be submitted within 90 days from the date of Inte...
Control Plan(download ourcontrol plan template) Measurement System Analysis (MSA)Studies Dimensional Results Material Performance Test Results Initial Process Studies -Statistical Process Control (SPC) Qualified Laboratory Documentation Appearance Approval Report (AAR) ...