Employer业主,contractor承包商,subcontractor分包商,projectmanager项目经理,supervisor监理工程师,adjudicator裁决人,thecontractdate合同生效日,worksinformation工程信息,site工地现场,plant设备,material材料,thecompletiondate竣工日期,(accepted)programme(已认可的)施工进度计划,applicablelaw适用法律,defect缺陷,fee...
5、defect 缺陷,fee 间接费,ambiguity/discrepance 歧义,inconsistency 矛盾, working area 施工作业区域。,Actions 10-工作原则 10,10.1 The Employer, the Contractor, the Project Manager and the Supervisor shall act as stated in this contract and in a spirit of mutual trust and co-operation. The Adju...
(15)A Defect is ·a part of the works which is not in accordance with the Works Information or ·a part of the works designed by the Contractor which is not in accordance with ·the applicable law or ·the Contractor’s design which has been accepted by the Project Manager. 第二十四页...
5、r 监理理工程师师,adjudicator 裁决决人,thecontractdate合合同生效效日,worksinformation工工程信息息,site工工地现现场,plant设设备,material材材料, thecompletion date竣竣工日日期,(accepted)programme (已已认可的的)施工工进度计计划,applicable law适适用法律律,defect缺缺陷,fee间间接费费,ambiguity/discrepan...
said design data parameters being extracted from layout data output from said designing center, so that a revision is automatically returned to a previous version when a defect is caused in a product and is used by said revision-management database to estimate the performance and the area of a...
A defect detecting device 10 includes an overall displacement measurement unit 11 that measures, based on observation data output from an observation device that obser
5E: Defects CertificateAppendix 5F: Supervisor's instructionAppendix 5G: Contractor's notification of test/inspection and resultsAppendix 5H: Supervisor's notification of test/inspection and resultsAppendix 5I: Supervisor's notification of a DefectAppendix 5J: Contractor's notification of a DefectBronwyn...
Employer业主,contractor承包商,subcontractor分包商,projectmanager项目经理,supervisor监理工程师,adjudicator裁决人,thecontractdate合同生效日,worksinformation工程信息,site工地现场,plant设备,material材料,thecompletiondate竣工日期,(accepted)programme(已认可的)施工进度计划,applicablelaw适用法律,defect缺陷,...
Employer业主,contractor承包商,subcontractor分包商,projectmanager项目经理,supervisor监理工程师,adjudicator裁决人,thecontractdate合同生效日,worksinformation工程信息,site工地现场,plant设备,material材料,thecompletiondate竣工日期,(accepted)programme(已认可的)施工进度计划,applicablelaw适用法律,defect缺陷,fee...
Employer业主,contractor承包商,subcontractor分包商,projectmanager项目经理,supervisor监理工程师,adjudicator裁决人,thecontractdate合同生效日,worksinformation工程信息,site工地现场,plant设备,material材料,thecompletiondate竣工日期,(accepted)programme(已认可的)施工进度计划,applicablelaw适用法律,defect缺陷,fee...