利用遗传算法(GA)求解混合流水车间调度问题(Hybrid flow-shop scheduling problem, HFSP) 其中:main.m是主函数,直接运行即可;GA.m是算法的代码;colorplus.p是一个颜色补充包,用于获得甘特图的颜色配置;cheatsheet.png是colorplus.p颜色补充包中的颜色参考示范以及调用方法说明;gantt_chart.m用来绘制甘特图;objective.m...
(2013). Dynamic set-up rules for hybrid flow shop scheduling with parallel batching machines. International Journal of Production Research, 52, 3842-3857.Dynamic set-up rules for hybrid flow shop scheduling with parallel batching machines[J] . Andrea Rossi,Andrea Pandolfi,Michele Lanzetta....
Hybrid flow shop (HFS) scheduling has been extensively examined and the main objective has been to improve production efficiency. However, limited attention has been paid to the consideration of energy consumption with the advent of green manufacturing. This paper proposes a new ant colony optimizatio...
This paper presents a two-stage hybrid flow shop scheduling problem with setup and assembly operations. The proposed study of this paper considers one kind of product with a quantity of demand where each product is made by assembling a set of different parts. At first, the parts are ...
W. Chang, "A hybrid flowshop scheduling model considering dedicated machines and lot-splitting for the solar cell industry," International Journal of Systems Science, 2013.A hybrid flowshop scheduling model considering dedicated machines and lot-splitting for the solar cell industry[J] . Li-Chih ...
In this paper we consider a two-stage hybrid flowshop scheduling problem, where each of n tasks is to be processed first at stage one and then at stage two. The first stage contains several identical discrete machines and the second stage contains several identical batching machines. Each discr...
This paper considers the two-stage hybrid-flowshop scheduling problem with sequence-dependent setup times where the objective is to minimize the makespan. In comparison to the familiar two-machine flowshop problem we are given two stages instead of two machines each containing a given number of pa...
3) Real-time hybrid flowshop scheduling 实时混合流水车间调度 4) job-shop scheduling problem 车间作业调度 1. Grafted genetic algorithm for thejob-shop scheduling problem; 解决车间作业调度问题的嫁接遗传算法 2. MRP disassembly,job-shop scheduling problemand network planning are related together,Newthough...
Botta-Genoulaz V (2000) Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness. Int J Prod Econ 64(1–3):101–111Botta-Genoulaz V. (2000) Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness. International...
We study the scheduling of N jobs in a V-stage hybrid flow shop with identical parallel machines, when jobs are subject to precedence constraints, several time lags, and due-dates. Precedence constraints concern jobs; they enable the modeling of several uses of the same sequence of machines or...