目视飞行规则进近/离港指导 14 CFR Part 77《直升机场通航空域的安全、有效使用和维护》中定义的假想面适用于垂直机场,包括主面、进近面和过渡面。 本章内容规定了影响通航空域物体的标准与要求,为评估建造或变更航空操作程序的影响提供了依据;确定拟建工程对空中航行的潜在危险影响,加强新物体的安全空中导航。 主表...
目视飞行规则进近/离港指导 14 CFR Part 77《直升机场通航空域的安全、有效使用和维护》中定义的假想面适用于垂直机场,包括主面、进近面和过渡面。 本章内容规定了影响通航空域物体的标准与要求,为评估建造或变更航空操作程序的影响提供了依据;确定拟建工程对空中航行的潜在危险影响,加强新物体的安全空中导航。 主表...
FAA 14 CFR PART 65-2011 认证:除了飞行机组人员的飞行员 FAA 14 CFR PART 101-2011 系留气球,风筝,非专业火箭和无人驾驶自由气球 FAA 14 CFR PART 77-2011 受物体影响的可航空域(2011年1月18日之前有效) FAA 14 CFR PART 120-2011 毒品和酒精试验规程 FAA 14 CFR PART 142-2011 培训中心 FAA 14 CFR...
We provide FAA OE/AAA Aeronautical Obstruction Evaluation Consulting in accordance with Title 14 CFR (Code of Federal Regulation) Part 77 Notice Criteria. We study and predict the constraints of your project, prior to the FAA's 45-day Aeronautical Obstruction Evaluation Review. ...
Aircraft operating under 14 CFR Part 91 are not required to comply with established takeoff minimums. Legally, a zero/ Part 121 and Part 135 holders have the ability, zero departure may be made, but it is never advisable. If through the use of approved OpSpecs, to use lower-than- ...
此外,修理站Ameco-Beijing 为14 CFR 129部营运人所属的飞机、发动机或 附件执行的维修活动必须遵循营运人的经FAA批准的维护方案,而为14 CFR 125部 营运人所属的飞机进行检查工作时,必须遵循经FAA批准的营运人检查方案。 1.1.4 列在批准的运行规范或批准的能力清单中的维修或修理项目可以根据批准实施放 行,并颁发...
CFR 49, Part 830 (NTSB 830), Aeronautical Information Manual, PC/G. Like this app? Check out our other aviation applications: • FAA Test Prep - Private Pilot (PVT) • FAA Test Prep - Instrument Pilot (IR) • FAA Test Prep - Commercial Pilot (COM) • FAA Test Prep - ...
CFR 49, Part 830 (NTSB 830), Aeronautical Information Manual, PC/G. Like this app? Check out our other aviation applications: • FAA Test Prep - Private Pilot (PVT) • FAA Test Prep - Instrument Pilot (IR) • FAA Test Prep - Commercial Pilot (COM) • FAA Test Prep - ...
CFRFederal Regulation CIRCircuit Number CITCitation CMNContinuous Move Number CMPCustomer Maintenance Period Sequence Number CMTComponent CNOCommitment Number COLCollocation Indicator COTCertificate of Transportation CPACanadian Province Operating Authority Number CPTCurrent Procedural Terminology Code CRNCasualty Repor...
part 15, subpart b, incidental radiator, classification, and testing for conducted and radiated interference. b. the addition of crest factor limit testing. c. a change to the output current tolerance of a ccr to 0.1 amp (a) for 6.6a and 0.3a for 20a. 4. application. the specifications...