网络向家坝水电站 网络释义 1. 向家坝水电站 zh.wikipedia.org|基于 1 个网页 例句
Model Test of River Closure at Xiangjiaba Dam Hydropower Project Hydraulic model test is conducted to study and determine location of river closure dike,selection of river closure gap location,division of gap section and... R Xiao,M Meng,ZX Wang - 《Water Conservancy Science & Technology & Eco...
则分别针对珠江ChangzhouDam 和三峡大坝上下游鱼类分布进行了研究。但是,目 前针对长江上游鱼类空间分布的研究还很少见。 水声学调查方法以其快速方便,不伤害鱼体等 优点正在被广泛应用于鱼类资源量评估和鱼类时空 分布研究 [11] 。 目前在鱼类空间分布研究中该技术 可通过回波图直观地观察整个探测范围内从声波发 射...
The Xiangjiaba Dam is a critical structure that affects many people, and it is built in a seismically active region. The Xianshuihe fault is one of the most active faults in southwest China. So seismic monitoring and structural monitoring are essential aspects for the dam. Solution GeoSIG Partn...
HUO J X, SONG H Z, LUO L.Investigation of groundwater chemistry at a dam site during its construction:a case study of Xiangjiaba Dam, China[J].Environmental Earth Sciences, 2015, 74 (3) :1-11.HUO Jixiang, SONG Hanzhou, LUO Li. Investigation of groundwater chemistry at a dam site ...
During the capping construction of the chamber within the section of the aqueduct for the ship-lift of the dam for Xiangjiaba Hydropower Station,the construction scheme of "suspended specialized mobile supporting frame + precast arch +protection truss"is adopted for the first time,and then the pro...
网络向家坝水电站 网络释义 1. 向家坝水电站 ... ) water power dam 水电站坝 )Xiangjiaba hydropower station向家坝水电站) Xiangjiaba Power Station 向家坝电站 ... www.dictall.com|基于2个网页 例句
5) Xiangjiaba Hydropower Project 向家坝水电工程 例句>> 6) Xiangjiaba Dam 向家坝大坝补充资料:坝内水电站 在大坝内部留一孔洞,厂房放在孔洞内的水电站。坝内水电站的主要优点是:①遇到河谷狭窄、洪水流量大、地面厂房布置有困难时,可以解决好大坝泄洪和厂房布置的矛盾。②它同地下水电站相比,一般工程量较小...
7.The Research on Engineering Flexibility of Longpan Dam Region of Tiger Leaping Gorge Hydroelectric in Jingsha River;金沙江虎跳峡水电站龙蟠坝址区建坝条件的工程适宜性研究 8.Study on the Engineering Geological Property of Deep Overburden in the Qizong Hydroelectric Power Station, Jinsha River金沙江其...
2) Xiangjiaba Dam 向家坝大坝3) Xiangjiaba Hydro Station 向家坝工程 1. Dynamic Visual Simulation for Concrete Dam Construction Process of the Xiangjiaba Hydro Station; 向家坝工程大坝混凝土施工过程动态仿真研究 更多例句>> 4) Xiangjiaba Reservoir Area 向家坝库区...