(5) respectively, whereby the hollow post is divided by one or several seals (20) in at least as many compartments (21 and 22} as there are panels (3 and 4), whereby each compartment (21 and 22), together with the above-mentioned drainage holes (18 and 19), forms a separate ...
Yes, we can do 15um and above.Q5: What color you can do for powder coating? The thickness for powder coating? A: We can do any color for powder coating as long as you can provide the color sample. Our normally powder coating thickness is ...
Lifetime Above 30years Scope of Application Apply to commercial houses, hotels, villas, office buildings, prefabricated houses and etc Glass OptionClear glass, Laminated glass, Tinted glass, Low-E glass, Frosted glass, all tempered glass and etcSingle glass: 4mm, 5...
Lifetime Above 30years Scope of Application Apply to commercial houses, hotels, villas, office buildings, prefabricated houses and etc Glass OptionClear glass, Laminated glass, Tinted glass, Low-E glass, Frosted glass, all tempered glass and etcSingle glass: 4...
Besides production time mentioned above, usually it takes maximum 10-15 days for shipment to any destination port around the world. Q5. Are items shown on website ready to deliver after order is placed?Most of the items are needed to be...
7. Sliding panel in accordance with one of the claims 1-7, characterised in that a set of additional guide means (27', 29'; 27",29") which are arranged cooperating in pairs and placed directly above each other and on the sliding panel (12,112) and on the support panel (11) in th...
180 . In accordance with the invention the sliding armature (15) is provided with a locking shoulder (36), which, when the frame is closed, protrudes above the frame roughly parallel to said groove and is designed to, in the closing phase, mesh with a recess (40) in the upper piece ...
Window mulled above another window or door. Triple pane glazing The use of three panes of glass made into an insulated sealed unit for a window or door. U-factor Rate of heat transfer from warm to cold areas in watts per square metre Kelvin (W/m2K), the lower the number, the more ...
Besides production time mentioned above, usually it takes maximum 10-15 days for shipment to any destination port around the world. Q5. Are items shown on website ready to deliver after order is placed? Most of the items are needed...
The lock described above has several advantages over prior constructions, but it is particularly characterized in its ability to be conveniently mounted in any one of a variety of situations. The range of application of the lock is therefore larger than for prior locks of the same general kind....