This simulator is also capable of handling the uncertainty of various input variables and performs full-factorial design calculations for a three-level design (that is, P10, P50, and P90). This feature facilitates capturing uncertainty of drainage area and/or any other variables while predicting ...
Zoom! Zoom!(.,P10) 04:43 【120集合集】- 11.0a Unit 11 Little Squirrel(.,P11) 05:07 【120集合集】- 12.0a Unit 12 Happy New Year(.,P12) 05:24 【120集合集】- 13.0b Unit 1 Jack-in-the-box(.,P13) 06:34 【120集合集】- 14.0b Unit 2 Merry-go-round(.,P14) 04:56 ...
aThe program file is not in accord with the existing company procedures 程序文件不是与现有的公司规程一致[translate] aRanges of in-place volumes and recovery factors were subjected to a triangular-shape Monte Carlo simulation where P90, P50 and P10 estimates of recoverable volumes were generated. ...
aRanges of in-place volumes and recovery factors were subjected to a triangular-shape Monte Carlo simulation where P90, P50 and P10 estimates of recoverable volumes were generated. Contingent Resources of solution gas were calculated deterministically by multiplying Oil Contingent resources resulted from ...
earners, expressed as a ratio over whatever income would put the earner at the threshold of the bottom 10 percent of earners); P90/P50 (income threshold to reach the top 10 percent, divided by the threshold for being at the fiftieth percentile on income); or the P50/P10 (OECD, 2016)....
categories of reserves also have different production probabilities assigned. For example, the oil industry gives proven reserves a 90% certainty of being produced (P90). The industry givesprobable reservesa 50% certainty (P50), andpossible reservesa 10% certainty (P10) of actually being produced....
- The Contingent plus Probable (1C plus 1P) P90 oil resource in the Barrow reservoir for Cyrano, Nasutus and Elimia is now assessed as 1.19MMstb while the (2C plus 2P) P50 is now assessed as 2.02 MMstb. Oil Basins Limited (ASX:OBL) Cyrano Oil Field R3/R1 Independent Review Confirms...
The methodology uses the differences between the log and core-based estimates to quantify uncertainty ranges at any arbitrary level (e.g. P90, P50 and P10). Quantitative comparisons are at their most useful when the uncertainty ranges derived can be placed within a known framework so that it ...