Fig. 2. Plan layout of Cashew station and its surroundings. The ground consists mainly of the man-made fill (denoted as fill), Kallang formation (F1 and F2), BTG residual soil (G VI), completely weathered Bukit Timah granite (G V), highly weathered Bukit Timah granite (G IV), moderate...
Once a model with GIS and sensors exists, operators can reference a layout of their entire system and start collecting data, even in small circuits, to capture what’s happening. Creating a digital replica can prioritize areas needing repairs and upgrades. Although it's cost-prohibitive to ...
(RTOS) still fail to implement even basic security mechanisms that have been standard in the desktop world for a long time, such as Address Space Layout Randomization (ASLR). This lack of security in the design of these systems leaves them vulnerable to attacks that can compromise the ...
from the river’s flow and sediment transport regimes [1], which lead to erosion and deposition processes that are determined by the combination of liquid and solid discharges in the river, sediment load grain size, and the river’s morphology, such as its slope and layout [2,3,4,5,6]...
Our team was called to the site as a passenger rail line running over the culvert was due for rehabilitation. The streambank’s layout and undercut nature posed multiple challenges to the diving team both above and under the water. Due to the presence of underwater obstruction, effectively ...
Web design is an artful blend of creativity, technical expertise, and user-centric thinking.By incorporating the fundamental principles of layout, color, navigation, and responsiveness, along with a focus on accessibility, performance, and continuous improvement, you can create engaging and user-friendl...
Managing transboundary river basins requires balancing tradeoffs of sustainable water use and coping with climate uncertainty. We demonstrate an integrated approach to exploring these issues through the lens of a social-ecological system, combining remot
The layout of the storage tank and other features must ensure that the available space for maintenance purposes is maximised. A minimum of 2 metre clearance between all assets and the reserve title boundary must be achieved where possible. It is recommended that trees are no closer to the Tank...
Fig. 2. Graphical layout of the equipment used for high-accuracy SfM-based mapping of seagrass transplantation (a) Permanent visible markers or ground control points (GCPs) and 1 × 1 m quadrats (in green) were placed on the seafloor inside the transplanting area, previously divided into 20...
The resulting network table was visualized using an edge-weighted spring-embedded layout in Cytoscape version 3.8.293. The Map of Aldabra, tidal tables and amplitudes were kindly supplied by the Seychelles Island Foundation (SIF). The global map indicating the location of Aldabra was generated ...