aThe contractor shall train the employer’s staff attached to the project in the use of the software used for design. This shall be part of the scope of supply. Towers shall be plotted on the profile in the most optimum location considering both engineering and economics. Considerable study an...
I must agree with blender, It's what I learned on. But trying to go back to it after using 3DS Max for a while is impossible. Everything is buried under so many tabs.My