A full-scale nonradioactive in-can melter became operational at Pacific Northwest Laboratory in April of 1977. The furnace has six independently controlled... Blair,H Thomas - Trans. Am. Nucl. Soc.; (United States) 被引量: 1发表: 1978年 Extendable spout for use with ice and water dispens...
Asphalt, no matter the type used, requires heavy equipment to install. Distributor trucks, sand spreaders, paving equipment and graders are all needed in order to lay asphalt surfaces properly and smoothly. This type of equipment can be rented in small-scale form for a driveway project, but i...