Primary POSITION vacancy bulletins, which will comprise of a Posting Notice and a Pilot Position List, shall be posted on all Pilot bulletin boards, and shall state the following; Bulletin number and date of issue; Aircraft type, Status and base; Rate of pay; Number of vacancies; Anticipated...
Herein, aided with bench and pilot plant data, we established engineering a kinetics model and multiscale reactor models for heterogeneous EC hydrogenation using representative industrial-type reactors. Model-based analysis indicates that single-stage adiabatic reactors, despite a moderate temperature rise ...
The EC hydrogenation pilot reactor was operated at a production capacity of 1000 talcohol/a and had steadily run for over 72 h to allow collection of all reaction products. The structure and working conditions of the pilot reactor are shown in Table 3. Simulations were conducted with the same...