CONSTITUTION:A moving ceiling 1 is drawn and supported by winches disposed on radial lines drawn at intervals of 45 deg. from the center of an opening and closing doom roof ring beam 2. The moving ceiling 1 is made into a net ceiling by wire cables knitted in a spider web form by ...
PROBLEM TO BE SOLVED: To provide a slide type roof carrier slidable in the direction of the vehicle width capable of performing the unloading operation with a uniform force even when a movable placing part with loads placed inclines and thereby liberating the operator from bearing a large burden...
PURPOSE: To form a roof outer wall where projections and recess grooves are alternately connected to each other in the seam joining direction by a seam joining method. ;CONSTITUTION: An upper roofing material 2 and a lower roofing material 3, and a heat insulating core material 4 packed in ...
A2:We have 22 production lines, we can produce one container about 2 days, once get your advance payment,we will arrange the loading within 7 days.Q3:What's the guarantee time of this product?A3:For plastic ASA PVC roof tiles, our guarantee time is 10 ye...
lines are available with either a roller feed drive measuring system or a carriage type system with rack and pinion measuring for the ultimate in accuracy. ficepgroup.com 菲赛普数控角钢系列生产线 ,可选择辊轮进给测量系统或更为精准的带有齿条齿轮测量 系 统的 机械手 进 给 系 统。 ficepgroup.co...
In this form, Shuten-douji is accompanied by a familiar named(ハク). During the events surrounding Oniland, thewhich was with her was actually(モシレチクチク・コタネチクチク), a demon fromlore, who was using her and the others to claim the Kamuy Gold. Following the conclusion of th...
Sangobuild has 6 advanced automatic production lines and the output could be 800,000 pieces per month. We usually finish the production within 15 days after receiving the deposit.3. Professional Service Sangobuild exports the stone-coated roof tile to more than 20 countri...
Crane assembly:We have three assembly lines crane bridge, through the process of process control, machine to achieve quality assurance; through the process flow control, ensure the whole machine quality. Electrical equipment parts:All wiring of the components in the elec...
• Control device for operation of outdoor units at low ambient temperatures •BMS devices •Tropical climate design •Roof curb •Pre-filter; Secondary filter; HEPA filter •Hot water coil •Electrical heater Model 003 004 005 006 007 008 010...
Sangobuild has 6 advanced automatic production lines and the output could be 800,000 pieces per month. We usually finish the production within 15 days after receiving the deposit.3. Professional Service Sangobuild exports the stone-coated roof tile to m...