The utility model discloses a base of a novel timber lashing movable upright post. The base comprises a base body, wherein the base body consists of a shim plate, a front sealing plate, a rear sealing plate, a left side plate and a right side plate and is roughly cubic; a pin shaft...
This paper presents a review of the possible methods for testing the fire performance properties of reused timber through non-destructive techniques, focus
Improving the Moment Resistance of a Concealed Timber Post Base JointStabilizing elementfinite element modellateral displacementtimber-framepost and beamserviceability limit stateThe Korean traditional house, Hanok, is a post-and-beam timber structure with a large tiled roof designed to keep the house ...
(a) Natural postfire conifer regeneration within a large, high-severity fire patch 1 year after the Rim Fire of 2013, in terms of seedling density and (b) the percentage of regeneration comprised of pine species (ponderosa and sugar pine) with increasing distance into the high-severity fire ...
a你电脑用得越熟练,你找到担任秘书工作的可能性就越大 Your computer uses skilled, you found hold the post of the possibility which secretary works to be bigger[translate] ascared of 惊吓[translate] aSecond, whether covering certain specific aspects of concrete action or providing a general schema ...
hybrid simulation (HS) of the seismic response of two-story two-bay 1:2 scale post-tensioned timber frame [24], (ii) a newly conceived analytical model of the beam–column connection, and (iii) the experimental validation of the analytical models of both beam–column and column base ...
IF that bolt runs all the way through that splitting post and is adequately closed with large steel washers and one or more nuts, it's probably what's holding that split post together. We can not see that detail. With the caveat that I'm not a structural engineer, in my OPINION NO...
We had kept hay bales on each of the point load points for the building in order to keep frost from getting too deep into the ground. After we marked each post location, Zach installed the eighteen metal posts. The “helical piles” have an auger profile on the base, and are literally...
3. Detail discussion and negotiation. 4. A final confirmed shop drawing and PI will be send to you to make deposit. 5. Production will be arranged if we received your deposit. 6. Inspection picture will be send to you when production finished. ...
The original blog post analyzed values based on a rolling 12-month time frame. This new update will provide more detail by looking at values over a full 3-year period (2017-2019). In keeping with the format of the original post, the information below includes pine stumpage[i]values from...