implemented, such as covering the tipping face with 300 mm thick layer of soil and then with a layer of cement-based material [...] legco.gov.hk 環保署表示,當局已採取進一步的氣味管理和控制措 施,例如在雨季期間每天完成接收廢 物 後, 加 厚 覆 蓋 廢物 傾倒 面的泥土層至300毫米,然...
The covering layer, the thick film coating and the carrier are selected from a material that fulfills every of the following equations: 1 A T 1 ' T 0 d 1 = a × 3 A T 3 ' T 0 d 3 , 2 A T 2 ' T 0 d 2 = b × 1 A T 1 ' T 0 d 1 , 2 A T 2 ' T 0 d 2...
implemented, such as covering the tipping face with 300mmthicklayer of soil and then with a layer of cement-based material [...] legco.gov.hk legco.gov.hk 環保署表示,當局已採取進一步的氣味管理和控制措 施,例如在雨季期間每天完成接收廢物後,加厚覆蓋廢物傾倒面的泥土層至300毫米,然後在面層噴...
control measureshavebeenimplemented, such as covering the tipping face with 300mmthicklayer of soil and then with a layer [...] legco.gov.hk legco.gov.hk 環保署表示,當局已採取進一步的氣味管理和控制措 施,例如在雨季期間每天完成接收廢物後,加厚覆蓋廢物傾倒面的泥土層至300毫米,然後在面層噴上...
The influence of the thickness of a covering liquid layer and its viscosity as well as the impact velocity on energy loss during the normal impact on a fla... S Antonyuk,S Heinrich,N Deen,... - 《颗粒学报(英文版)》 被引量: 99发表: 2009年 Gravitational instabilities of thin liquid la...
implemented, such as covering the tipping face with 300mmthicklayer of soil and then with a layer of cement-based material [...] legco.gov.hk legco.gov.hk 環保署表示,當局已採取進一步的氣味管理和控制措 施,例如在雨季期間每天完成接收廢物後,加厚覆蓋廢物傾倒面的泥土層至300毫米,然後在面層噴...
This study demonstrates that the new method can fabricate uniformly thick layers covering the entire surface of a serpentine 3D substrate and can be used during the generation of vascular replicas. A new dip coating method to create a uniformly thick final layer on a serpentine 3D substrate is ...
Edge wrap-around protective extension for covering 优质文献 相似文献 引证文献High Voltage Schottky Barrier Diodes on P-Type SiC using Metal-Overlap on a Thick Oxide Layer as Edge Termination P-type 6H SiC Schottky barrier diodes with good rectifying characteristics upto breakdown voltage as high as...
implemented, such as covering the tipping face with 300mmthicklayer of soil and then with a layer of cement-based material [...] legco.gov.hk legco.gov.hk 環保署表示,當局已採取進一步的氣味管理和控制措 施,例如在雨季期間每天完成接收廢物後,加厚覆蓋廢物傾倒面的泥土層至300毫米,然後在面層噴...
as covering the tipping face with300mm thicklayer of soil and then with a layer of cement-based material [...] legco.gov.hk legco.gov.hk 環保署表示,當局已採取進一步的氣味管理和控制措 施,例如在雨季期間每天完成接收廢物後,加厚覆蓋廢物傾倒面的泥土層至300毫米,然後在面層噴上一層名為"posi...