The work breakdown structure is an excellent tool for objective control and evaluation. Which of the following is generally not validated through the WBS A.Time, schedule, and cosB.Management coordination and organizational structurinC.Risk and impact of decision―makinD.Quality of the wor 相关知识...
网络释义 1. 工作分层结构 ...划(cash flow projections),工作分层结构(the work breakdown structure),确认的风险(identified risks)和计划人员配置(plane…5337kun.blog.163.com|基于25个网页 例句 释义: 全部,工作分层结构 更多例句筛选 1. Create the work breakdown structure with the team to develop the ...
The work breakdown structure comprises several levels of decomposition of the total project. The lowest level of definition is always the___ A. planning element B. work package C. subtask D. working interface 相关知识点: 试题来源: 解析 B 正确答案:B 解析:工作分解结构(WBS)包括了对项目几个...
The work breakdown structure (WBS) is an excellent tool for objective control and evaluation. Which of the following is generally NOT validated through the WBS? A.Time, schedule and cost. B.Management coordination and organization structuring. C.Work methods and accountability. D.Quality of work....
The work breakdown structure (WBS) has been widely used in management for software development project, ( ) is generally NOT validated through the WBS. A. Schedule and cost B. Organization structuring C. Management coordination D. Quality of work 相关知识点: ...
B. Project objectives, dependencies, plan, cost control C. Project scope, schedule, staffing, cost control D. Project scope, quality, schedule, dependencies E. Project budget, schedule, risk factors, work assignments相关知识点: 试题来源: 解析反馈 收藏 ...
The work breakdown structure(WBS) used in the classical sense is a practical methodology used for ___. A) adding activities to the projectB) expanding the scope of the projectC) developing a responsibility matrix for work assignmentsD) delineating project work effort into discrete and logical...
The work breakdown structure comprises several levels of decomposition of the total project.The lowest level of definition is always the () . A. planning B. element C. subtask D. working interface 相关知识点: 试题来源: 解析 B 工作分解结构包括完整项目的几个层次的分解,在工作分解结构中定义的...
B. Project objectives, dependencies, plan, cost control C. Project scope, schedule, staffing, cost control D. Project scope, quality, schedule, dependencies E. Project budget, schedule, risk factors, work assignments相关知识点: 试题来源: 解析 官方提供 A 反馈 收藏 ...
In the past year, both Mil-Std-881 on work breakdown structures and Mil-Std-499 on systems engineering have undergone revision. The revised systems engineering standard creates new purposes and uses for an "engineering" work breakdown structure (EWBS) consistent with concurrent engineering ...