Xylem wins Thames Water framework agreementingentaconnectFiltration & Separation
One of the proposals for the water gate, to reunite it with the river whilst maintain it in its original position, was to run a pipe from the river, under the Embankment, over the rail tracks of the new cut and cover railway, and to a large pond around the water gate. This would ...
Xylem wins Thames Water framework agreementdoi:10.1016/S0015-1882(12)70063-0ELSEVIERFiltration + Separation