In line with its focus on supporting clean energy inSouth Africa, the Bank will provide a USD 480 million project loan to Eskom Holdings SOC Ltd. for Environmental Protection Project for Medupi Thermal Power Plant (TPP). The loan will be used to fi...
The extension rate in the east sag was higher than that in the west area. The extension rate in the middle part was lower relative to the east and west sags. This was because the rifting was controlled by the distribution of the main boundary fault along the basin. Temporally, the ...