Tapered insulation is not mandatory, but highly suggested to ensure proper water drainage, learn more on our products and service page! How long does the material last? If installed properly, tapered insulation can last between 20 to 30 years before renewal, please visit our products section! Do...
Larry E. KirkpatrickBarry C. WilliamsUSUS4498807 * 1983年9月8日 1985年2月12日 Polydrain, Inc. Drainage channel with means for maintaining proper slope during installationUS4498807 * Sep 8, 1983 Feb 12, 1985 Polydrain, Inc. Drainage channel with means for maintaining proper slope during ...
achieve positive slope to aid in proper drainage. This patented technology provides a durable finish with the ability to match existing roofing compositions. The RoofSlope compound is excellent for new construction as well as retrofit work, minimizing costs associated with fixing slope-to-drain issues...
Slope erosion and flooding of the open-pit mines are typical problems which need proper drainage controls at the heavy rainfall region where surface drainage pattern is dominated by the fast change of landform due to mining operation. Th... C.,Sunwoo,Y.S.,... - Tenth International Symposium...
These data were originally calculated for the purpose of mechanical landslide modeling, and are used here as a statistical constraint on landslide susceptibility. ★mechanical parameters ★mechanical propertied ★mechanical response ★mechanical strains ★mechanism e.g. The output pore water pressure were...
Slope erosion and flooding of the open-pit mines are typical problems which need proper drainage controls at the heavy rainfall region where surface drainage pattern is dominated by the fast change of landform due to mining operation. Th... C.,Sunwoo,Y.S.,... - Tenth International Symposium...
As a contractor or builder, do you need to find the difference in elevation to maintain a proper slope? Need to build a patio and figure out the difference in height to establish that 2% slope for drainage? Are you required to build a berm at a maximum slope of 33%? This app will ...
Road Design: Engineers use slope to determine the grade of roads, ensuring they are safe and manageable for vehicles. Steep slopes on roads can be hazardous, especially in adverse weather conditions. Architecture: Architects consider slope when designing roofs to ensure proper drainage and to achiev...
aThe catchments area, run-off coefficient, hydraulic slope, design flood discharge and water elevation for the appropriate return period shall be determined for each drainage structure. Cross-sections and gradients of watercourses shall be surveyed to determine the proper drainage, erosion protection of...
{HHT}= -0.05\)) was used and a fixed time increment of\(10^{-3}\)s was set. A constant hydrostatic pore water pressure was assigned to all nodes at the top and the sides of the model, allowing for drainage. The reaction forces of the lateral boundaries were imposed at the ...