Due to inherent cyclic load for solar generation, with peaks and valleys along the day and months on a year, the transformer rated power can be better adjusted to an average value in such a way that loss of life is closer to unitary during a complete year period of evaluation; in this ...
Generator circuit-breakers (GCB) are essentially located between the generator and the step-up transformer of the high voltage network.In generator circuits two different faults are possible with a combination of high short-circuit current at high asymmetrical components: The system-source fault (...
We read every piece of feedback, and take your input very seriously. Include my email address so I can be contacted Cancel Submit feedback Saved searches Use saved searches to filter your results more quickly Cancel Create saved search Sign in Sign up Reseting focus {...
Load Steps Load steps refer to the amount of load that will be placed on a genset at one time.A genset may accept load in one load step, or may spread it out over several load steps. The customer can identify the needs of the environment and then a proper method of starting ...
2. The concept of supplier selection and order allocation is prepared and accordingly, the sustainable supply chain network design model considering lot sizing and quantity of discount under disruption risk and its application to the transformer production is formulated as a centralized decision-making ...
In [35], size and location of different DGs, EVCSs and ESSs are optimized considering transformer rate limitation. Simulation studies are provided with 30 min. interval. 1.4. Contribution and scope In this work, simultaneous sitting and sizing of PVs, WTs, EVCSs, and ESSs are provided. A ...
The first step is to determine the maximum prospective short circuit (PSC) current that could flow in any part of the cable. If you don't know how to do this using the transformer impedance and supply cable impedance etc, then it is safe to use the potential current at the transformer ...
The modeled offshore substation O&M costs depend on the number of transformers; one transformer is added for every 250 MW of plant capacity, which is also used in the ORBIT model. Annual service and inspections are preventive maintenance tasks and all other tasks are corrective. Repair costs ...
(20)), and the transformer at the point of common coupling cannot be operated to concurrently import and export electricity (Eq. (21)).(15)Pcmin≤Pc(t)≤Pcmax,(16)EBmin≤EB(t)≤EBmax,(17)Pch,Bmin≤Pch,B(t)≤Pch,Bmax,(18)Pdch,Bmin≤Pdch,B(t)≤Pdch,Bmax,(19)EB(0)=NB.CB...
Two distinct CNNs are trained: U-net and a transformer-based Swin-U-net. A novel data reconstruction method is proposed that combines plane wave imaging (PWI), synthetic aperture focusing (SAFT) and total focusing method (TFM) to provide a unified volume reconstructed view. Both networks ...