We describe the central air conditioner operating problems that occur if an add-on air conditioning component (to an existing hot air heating system) is not properly sized for the building or if it is not properly matched to the pre-existing blower or air handler system that was used for ce...
These residence are equipped with central air conditioners or heat pumps. The periods with the highest cooling energy use were analyzed for each site. A standard industry sizing methodology (Manual J published by Air Conditioning Contractors of America) was used for each site to determine a sizing...
These residence are equipped with central air conditioners or heat pumps. The periods with the highest cooling energy use were analyzed for each site. A standard industry sizing methodology (Manual J published by Air Conditioning Contractors of America) was used for each site to determine a sizing...