NHPC is interested in overall sustainable development of hydro power project and giving utmost importance towards maintaining ecological equilibrium of the project-surrounding environment. This paper covers the implementation parts of catchments area treatment plan (a Watershed Management Plan) of Rangit H...
Dynamic Risk Assessment of Landslide Hazard for Large-Scale Photovoltaic Power Plants under Extreme Rainfall Conditions. Water (Switzerland), 2023, 15(15): 2832. DOI:10.3390/w15152832 59. Li, J., Wang, W., Chen, G. et al. Secondary-factor division optimization based on ET-GA to improve...
The Chuzachen power project was built as a part of agreement made by Gati with the Sikkim Government to commission three power plants at Chuzachen (110MW), Bhasmey (51MW) and Sada Mangder (71MW). The Chuzachen hydropower project is promoted by the Sikkim Power Development Corporation. ...
Aiming towards achieving of sustainable development at the rural and urban (especially the rural) levels, the importance of Alternative Energy Technologies (AET's) (like biogas plants and stoves, wind-solar hybrid system, solar systems, micro hydro power project etc.) has increased. Apart from ...