3.ElectricalConnections: ConnectthepowersupplytotheservomotorbyfollowingtheelectricalwiringdiagramprovidedbySIEMENS.Itiscrucialtoensurethatthepowersupplymatchesthemotor'svoltagerequirements.Makesureallconnectionsareproperlytightenedandinsulatedtopreventelectricalhazards.Double-checkthewiringtoavoidanypotentialmistakes. 4.Encod...
the BOP-2 operator panel 158 5.6.1 Switching the motor on and of 159 5.6.2 Changing parameter values 160 5.6.3 Changing indexed parameters 161 5.6.4 Entering the parameter number directly 162 5.6.5 Entering the parameter value directly 163 5.6.6 Why can a parameter value not be changed ?
The BaseUnits provide the electrical and mechanical connection for the ET 200SP components. Bright BaseUnits permit a new potential group up to max. 10 A Dark BaseUnits forward the self-assembling voltage busbars P1, P2 and AUX from the left to the right BaseUnit. Suitable BaseUnits with 12...
Side panel mounted to the right – ✓ ✓ ✓ – ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ M27 Side panel mounted to the left ✓ ✓ ✓ ✓ – ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ M43 Degree...
Electricalequipmentshouldbeinstalled,operated,serviced,andmaintainedonlyby qualifiednel.NoresponsibilityisassumedbySchneiderElectricforany consequencesarisingoutoftheuseofthismaterial. Aqualifiedisonewhohasskillsandknowledgerelatedtotheconstruction andoperationofelectricalequipmentanditsinstallation,andhasreceivedsafety ...
(4) Assign i/o points of PLC and draw i/o hardware wiring diagram of PLC. (5) Program and debug. (6) Design the operation console, electrical control cabinet, etc. of the control system and the installation wiring diagram. (7) Prepare design instructions and operation instructions. ...
November 2007 3 Mounting and installation 3.1 Regulations Electrical installation • Prior to installing the units, power must be turned off • The connections for mains and low-voltage are separated • For wiring, the requirements of safety class II must be satisfied • One and the same ...
Installation of external fuse of rating 275V AC / 0.5Amp for electrical circuitry is highly recommended. 7. Remove the scratch-guard from the meter display during commissioning of the panel. Wiring Guidelines 1. To prevent the risk of electric shock, power supply to the equipment must be kept...
安装说明书:Siemens BACnet PTEC扩展I O控制器通用I O布局 Installation Instructions Document No. 550-153 October 26, 2016 Smoke Control BACnet PTEC Extended I/O Controller Generic Controller I/O Layout. See Wiring Diagram for application specific details.Item No. 550-153 Rev. BA Page 1...
monitor the airfield lighting system, and to communicate with the rest of the ALCMS. The tower computer translates operator inputs into airfield lighting commands. It also scans the control panel settings to determine which lights should be controlled and to which portion of the circuit they ...