百度试题 题目架设全站仪的第一步是The first step in setting up the total station is 相关知识点: 试题来源: 解析 A 反馈 收藏
架设全站仪的第一步是The first step in setting up the total station isA.粗平 roughly levelingB.精平 exactly levelingC.测坐标 coordinatingD.测气压 taking barometric pressure的答案是什么.用刷刷题APP,拍照搜索答疑.刷刷题(shuashuati.com)是专业的大学职业搜题找
1.In terms of the disadvantages in the take-up/pay-off operation for copper conductor PVC insulated wires(short as installation wire),technical improvement was made.针对原来铜芯聚氯乙烯绝缘电线(简称布电线)收线与放线存在的缺点,进行了技术上的改进,阐述改进的方法及优点。 2.Aimed at the characterist...
Workstation clients access your application through a WSL process and one or more WSH processes. The WSL can support multiple Workstation clients. It acts as the single point of contact for all the Workstation clients connected to your application at the network address specified on the WSL comm...
The present invention relates to an apparatus for setting a layout point of a total station, so that a prism reflecting the light irradiated from the light source is fixed to be positioned at the precise layout point at which the measurement is desired. The apparatus includes: a laser pointer...
Set to "false" to change the first execution of a prepared statement to callsp_executesqland not prepare a statement. If a second execution happens, it callssp_prepexecto set up a prepared statement handle. enclaveAttestationUrl String
The rapid setting-out method comprises the following steps of placing a laser ejector on a total station telescope, guaranteeing that the direction of emitted laser and the collimation axis direction of the telescope are the same, calculating a setting-out angle and a setting-out distance through...
Cloud services provider EXE.IT helps more clients embrace green IT with Lenovo ThinkAgile MX Series, powered by Intel® Xeon® Scalable processors.
A landmark event wasthesettingupof theSynchrotronLightforExperimental Science and its Applications in the Middle East (SESAME) Centre in Jordan,[...] unesdoc.unesco.org unesdoc.unesco.org 教科文组织促进在约旦建立中东同步加速器辐射促进实验 科学及应用科学(SESAME)中心,这是一个里程碑事件。
I am a cart/geo TA and we got this new (at least new to us) TS02 for which I have to write a manual and teach students in 2 weeks, but I have a huge trouble with setting up the station&orientation and traversing. Any tips/suggestions/ideas/recommendations for a good manual would b...