set_wire_load_model set_wire_load_mode 小结 1.总述 在绕线之前,比如综合阶段为了估算线延迟的数值在lib中会提供不同的线延迟model,因此以上两个命令的主要作用就是估算线延迟所带来的影响。简言之,set_wire_load_model用于指定估算线延迟时所选用的模型,不同的模型所对应的计算原理略有差异,具体分析参考Foun...
set _ wire _ load _ min _ block _ sizeTypes, Data
Diameter of wire cord:索径多股螺旋弹簧钢索直径Deflection:变形量(挠度)弹簧沿负荷方向产生的相对位移Deflection at ultimate load:极限负荷下的变形量弹簧在极限负荷下沿作用方向产生的相对位移Free height(length):自由长度(高度)弹簧无负荷时的长度(高度)Free angle:自由角度扭转弹簧无扭矩作用时两臂的夹角Height(len...
The first issue is prealignment and the second image is post alignment.My discord name is @brownyb [BUG]I'm using the stable version. I'm trying to load a flightplan into the MCDU and it wont let me select the departure airport so I can set my runway or STAR. If I go to INIT A...
set _ wire _ load _ modelTypes, Data
The generator set load output wire connection terminal comprises an insulating plate and conducting rods. The insulating plate comprises an insulating plate body, conducting rod connection seats and installation holes. The insulating plate body, the conducting rod connection seats and the installation ...
The generator set load output wire connection box protective cover comprises a panel and side plates. Each side plate is provided with an installation portion. The side plates are rotatably fixed on the left sidewall and the right sidewall of the inner side of the wire connection box. The ...
The moving contact of a self-holding change-over contact set of monitoring relay is connected by a by-pass wire to the junction point between the supply line and the last load. The self-holding change-over contact connects in its rest position the by-pass wire (V1, V2) to the junction...
The moving contact of a self-holding change-over contact set of monitoring relay is connected by a by-pass wire to the junction point between the supply line and the last load. The self-holding change-over contact connects in its rest position the by-pass wire (V1, V2) to the junction...
set _ wire _ load _ selection _ groupCommands, Physical Implementation