2.1.1744 Part 1 Section 22.9.2.7, ST_OnOff (On/Off Value) 2.1.1745 Part 1 Section 22.9.2.14, ST_TwipsMeasure (Measurement in Twentieths of a Point) 2.1.1746 Part 1 Section 22.9.2.16, ST_UnsignedDecimalNumber (Unsigned Decimal Number Value) 2.1.1747 Part 1 Section 22.9.2.19, ...
This study’s findings point to several potential future directions. First, although tested as a stand-alone intervention in the original RCT [30], SGB could potentially be used as an adjunct treatment to first-line TFTs. As our analyses suggested that reexperiencing and arousal/reactivity sympto...
At this point, more research is needed to investigate the optimal cut-off values. Furthermore, a balance between healthy and unhealthy food advertisements being controlled by governments, educational programs at school, strictly healthy snack choices in schools or workplace canteens, and higher ...
The reason for point 3 is less clear. It suggests that there are two separate phases in the attachment of the primary antibody to its target in immunohistochemistry: 1. An initial diffusion related to factors such as pore size, antibody concentration, accessibility of the epitope. 2. A ...
A radiant heat source targeted to the hindpaw was applied until a withdrawal response or a 30 s cut off was reached. Withdrawal was quantified as a rapid removal of the paw from the heat source, shaking, licking, or biting of the paw was also considered an aversive response. Mice were...
and the grades sorted themselves out and became a procedural part of the job” (P15). A Canadianliteracy teachertalked about differences in their grading practices in comparison to math and science, “… math or science where it’s sometimes a little more cut and dry about that and more cle...
Experts point out a few ways. Disordered anger as it is sometimes called tends to be of greater intensity (强度). It takes very little to set off a person with an anger problem and their responses (反应) are very strong. An example: While most people would get upset if a driver cut ...
In addition, be sure to indicated that it is the instrument to cut the power supply of the controller. 3) Wiring must be carried out by personnel who have basic electrical knowledge and practical experience. NOTE 1) Provide power from a single-phase instrument power supply. If there is a ...
The impact of the on- and off-design point (Mach, Reynolds, tapper, incidence, etc.) on the secondary flows has been investigated in the scope of both LPTs [13,14,15,16,17] and high-pressure turbines [18,19,20]. The investigation of turbine geometries in a steady state environment ...
Receiver Operating Characteristic (ROC) curves were used to assess the predictive ability of the BSES-SF and to inform the choice of a cut-off point.For both of the ROC curves (4 and 12 weeks postpartum) the area under the curve was 0.74. To obtain a high sensitivity, a cut-off ...