check dammountain protectionJapanese experienceIn mountain areas, sabo check dams are commonly used to reduce the impact of debris flows. The dam construction decision process is a very important step in the design, and some experience in Japan is discussed. Past experience suggests that a ...
Some years, I end up bringing in takeout or even cooking for her at home, but I leave the decision up to her and try my damnest to make her happy. This year, she suggested a place we had never been, but both of us had always heard about: the California Grill (https://disneywor...
were allowed to recover the screen of water flow capacity by at once to flow down the dust along with the dam up the water by the screen when you water is to fall into the U-shaped in the waterway , also was accumulated dust on the screen , check dams water intake mechanism which is...
in a normal state and lodging of a water-intake gutter when clogging occurs due to flood or sediment.SOLUTION: In an inventive water-intake mechanism for check dam, a water-intake gutter which can be lodged or deformed is arranged at the downstream side of a waterway of a check dam. By...
The check dam has: a concrete structure 2 which is equipped with slits 3 for making the earth and the rocks permeate to a downstream side, and laid so as to block the downstream flow of the earth and the rock; cylindrical bodies 5 which are provided in the slits 3 so as to make ...
(57)< Abstract > < Objective > In the steel transmitted die check dam, the flowing down earth and sand gravelRustproofing of the surface being damaged easily by collidingThe metal tubing surface exposing, there are no times there not to be a rust prevention effect, the AcidThe metal tubing...
Q.: Study on the ultimate depth of scour pit downstream of debris flow check dam based on the energy method, Eng. Geol., 160, 103-109, 2013.PAN H L, WANG R, HUANG J C, et al. Study on the ultimate depth of scour pit downstream of debris flow check dam based on the energy ...
Method for forming opening in Sabo DammPROBLEM TO BE SOLVED: To form an opening part while preventing the outflow of sedimentary soil sedimented in a check dam.西尾 公
PROBLEM TO BE SOLVED: To provide a metallic permeation check dam constructed by taking an ecosystem into account and having high mechanical strength and reliability. SOLUTION: This metallic permeation check dam is constructed by forming extended parts 10b, 11b as restricting and holding parts for ...
A water-intake mechanism of a check dam includes a water-intake facility which comprise a hollow body fitted with an intake pipe disposed on an upstream side of a sleeve section of the check dam and a dust removal screen attached to an opening surface provided on the upstream side thereof,...