Retaining large sample map 翻译结果2复制译文编辑译文朗读译文返回顶部 Retaining wall detail drawing 翻译结果3复制译文编辑译文朗读译文返回顶部 Retaining wall detail drawing 翻译结果4复制译文编辑译文朗读译文返回顶部 Just like the parapets map 翻译结果5复制译文编辑译文朗读译文返回顶部 ...
A retaining wall comprising at least first and second elongated framing posts laterally spaced from each other, each framing post including an edge defining a slot area. A side fram
PURPOSE: A construction method of a temporary earth retaining wall using an H-pile coated with paraffin and a drawing method of an H-pile are provided to easily draw an H-pile out of the ground by reducing frictional force. CONSTITUTION: A construction method of a temporary earth retaining ...
drawing as they are immaterial to the understanding of the present invention. The inner wall of the cathode ring 12 and cathode 14 are made out of a ferrous metal composition as a formaminous sheet which can either be a woven wire-mesh or a punched metal material. However, because of ...
Origin:China;Surface Finish:Shot Peening, Polishing;Machining:CNC Machining;Service:OEM \ ODM;Applications Automotive:Motorcycle, Industrial;Drawing Format:2D/(PDF/CAD)3D(IGES/STEP);Shaping Mode:Punching Mold;Product Material:metal;Product:Other;Place of
PURPOSE: A construction method of a temporary rigid retaining wall using a deformed sheath for drawing a pile is provided to improve the rigidity of the retaining wall, to reuse the pile, to prevent environmental pollution, and to cut down construction cost by inserting the deformed sheath in ...
and it is an accident management concept currently investigated by several countries to remove the fission product decay heat of the core debris from the outside vessel wall and maintain the vessel integrity following a severe accident. In Korea, some part of this concept (only the provision of...
circular hole on the inflation side of the valve when deflation was occurring; during inflation, the inflation pressure from the bulb drove the check valve member back toward the retaining wall provided by a fixed cup. As previously noted, this arrangement was entirely satisfactory and workable, ...
PURPOSE: A deformed bag for drawing a pile for a temporary retaining wall is provided to reduce construction costs by reducing manufacturing expenses, and to draw a pile easily by reducing drawing resistance. CONSTITUTION: The deformed bag for drawing a pile for a temporary retaining wall ...
Referring to the drawing: Figure 1 is a cross section of a pavement slab in a condition of failure, showing a reinforcirig construction therefor and disclosing straight, rectangular-retaining curb members for the retention of the resurfacing materials thereon, and in this case illustrating brick as...