3. After circuit breaker QF1 is closed, air valve MFD-01&03 is opened and the corresponding running indicator is on. Press the Fan Opening button to start EF-BR and the Fan Running indicator is on. Press the Fan Closing button to No. / Check That / 检查项 stop EF-BR and the ...
Onsite installation of the solenoid valve Install an external horn strobe onsite. No.P009 Wiring Diagram From The Mains To The Power PDF Air outlet window Air Conditioner-1 Air Conditioner-2 Air Conditioner-3 Air Conditioner-4 Air Conditioner-5 Air Conditioner-6 Fan-1 ...
Valve Materials: Body and ball: DZR low-lead brass Ball: stainless steel Ball control stem: brass, chrome plated Ball seal seat: PTFE Control stem guide: PSU Seals: peroxide-cured EPDM Flow meter Materials: Body and headwork: DZR low-lead brass Bypass valve stem: stainless steel...
(9) Ventilation valve (10) Backup enable button (MANUAL STAND- ALONE)(11) Signal cable waterproofing bolt (COM, 3/4 in.) (12) PV input power cable waterproofing bolt (PV, 3/4 in.)(13) AC output power cable waterproofing bolt for (14) AC output power cable waterproofing bolt for ...
3. After circuit breaker QF1 is closed, air valve MFD-01&03 is opened and the corresponding running indicator is on. Press the Fan Opening button to start EF-BR and the Fan Running indicator is on. Press the Fan Closing button to No. / Check That / 检查项 stop EF-BR and the ...
3. After circuit breaker QF1 is closed, air valve MFD-01&03 is opened and the corresponding running indicator is on. Press the Fan Opening button to start EF-BR and the Fan Running indicator is on. Press the Fan Closing button to No. / Check That / 检查项 stop EF-BR and the ...
Onsite installation of the solenoid valve Install an external horn strobe onsite. No.P009 Wiring Diagram From The Mains To The Power PDF Air outlet window Air Conditioner-1 Air Conditioner-2 Air Conditioner-3 Air Conditioner-4 Air Conditioner-5 Air Conditioner-6 Fan-1 ...
Onsite installation of the solenoid valve Install an external horn strobe onsite. No.P009 Wiring Diagram From The Mains To The Power PDF Air outlet window Air Conditioner-1 Air Conditioner-2 Air Conditioner-3 Air Conditioner-4 Air Conditioner-5 Air Conditioner-6 Fan-1 ...
ports130. An iris valve135A, also known as an aperture valve135A, is inserted into each of the powder evacuation ports130for selectively opening and closing the powder evacuation ports130. The iris valve135A may be selectively opened and closed by an electric or manual actuator (not shown)....
6. A roller leveler according to claim 1, in which said fluid pressure operated means include a fluid pressure cylinder and piston at each corner of said housing, means for normally supplying fluid under pressure to the upper ends of the cylinders, and a relief valve set to open if upward...