国外工程项目设计过程中,设计除要提交图纸以外,还要提交一份技术规格书(Specificatiaon)的文件,通过对国外技术规格书(简称SPEC)的理论研究和现状分析,并结合国家援外工程技术规格书的实践经验,研发了适用于建筑工程设计,能控制工程品质标准,造价投资的项目技术规格书(Project Specification).供设计行业,建筑师负责制借鉴...
All references contained in the documents or drawings of the Construction Specification package shall be constructed as direct references to this specification. 这个规格定义了这个合同的项目具体要求。 在建筑规格包裹的本文或图画包含的所有参考将被修建作为在这个规格的直接参考。 [translate] ...
The quality, safety standards, success criteria and other requirements for this project are explained in the construction drawings and construction specification documents. These include but are not limited to the quality of materials, skills required from the construction crew, environmental compliance sta...
The mixing time for each batch, after all ingredients are in the mixer drum, shall be as follows: Capacity of Mixer Mixing Time 0.38 m3 or less 1.25 mins 0.57 to 1.15 m3 1.5 mins 1.53 and 2.3 m3 2.0 mins 3.06 m3 2.5 mins The mixing periods specified are based on the control of the...
Related to Developers Construction of the Project CONSTRUCTION OF THE PROJECT The Allottee has seen the proposed layout plan, specifications, amenities and facilities of the Apartment/ Plot and accepted the floor plan, payment plan and the specification, amenities and facilities annexed along with this...
Having reached the milestone M3 could mean that the specification has been produced and approved. M7 could be the start of production. These delivery stages must bedefined individually for every type of project. Meanwhile, they can be found in all industries. ...
Construction of the ProjectThe Allottee has seen the proposed layout plan, specifications, amenities and facilities of the Apartment/ Plot and accepted the floor plan, payment plan and the specification, amenities and facilities annexed along with this Agreement which has been approved by the competen...
They shall certify that the items are in agreement with the specifications, and approved their incorporation into the project. D. Progress Schedule: 1. The Progress Schedule required by the Owner shall be based on starting construction within 10 days after the notification of the award of the...
Main Purpose of the Job: - Joining the Programme and Project Services (P&PS) team as a Graduate Project Manager in China will enable you to gain the depth and breadth of experience required for you to achieve your Professionalism. 作为新一届储备项目经理,加入凯谛思中国项目管理服务团队将让你收...
(including at least architectural, landscaping, civil, structural, mechanical and electrical plans, building sections; and finish schedule), outline specifications following the Construction Specification Institute "CSI" Format and other necessary documents to fix and describe the size and character of the...