Fig. 11.Pore pressure profiles. The three plots here show theoretical 1-D profiles through a normally pressured (solid lines) and an overpressured (dashed lines) sedimentary section. The blue line is the pressure of a continuous column of water (hydrostatic pressure), the brown line is the ...
water pressure test [undefined]释义 常用 牛津词典 释义 水压试验; 双语例句 全部 1. Exhaust before water pressure test, drainage before manufacture, dryness and medium isolation. 水压试验前排气 、 生产前排水 、 干燥、介质隔离. 来自互联网 2. Electric water pressure pump: It is device for control...
water pressure n.水压,水压力 pressure( tight)test 【化】 耐压试验 pressure n. [U] 1.压力,挤压 2.【物】大气压 3.催促,要求,呼吁,强迫 4.心理压力,紧张 5.困扰,艰难 [U,C] 1.压力,压强 v.[T] 1.对……施加压力( water n. 1. 水,雨水,海水,水位,水面,流体,水域 v.[T] 1. 浇水...
But because of the tunnel inYellow River crossing project of the mid-route of South-to-north water transfer project with large, pressure pipeline and deep-depth tunnel, and also inner and outer lining of the tunnel must be under high pressure, so it makes the water pressure test is ...
a method based on water pressure test and field measurement of fractures is established.Measurement of fractures near boreholes is used to modify the result of field water pressure test.Moreover,rock mass is divided into several layers by modified absorption rate and absorption rate of each layer...
内容提示: Water pressure test(水压测试) When the water and electricity are checked and accepted When all the water pipes are properly welded, they can be tested, and all the plugs must be blocked prior to pressure measurement. All valves shall be closed and the valves of the water inlet ...
If the time delay produced by the delay lines in the reception channels of the individual array elements is τn and τn = tn, then the signals add in phase for all array channels, provided the signal in each channel is the same except for the individual time delay. The array directional...
The best way to efficiently clean outdoor surfaces is with a pressure washer, a blaster that uses less water to do its work than a garden hose and nozzle.
1The test is carried out under water because___.x_1Athe pressure under water is greater than in the airx_1Bthe first Comets exploded in the waterx_1Cit will be easier for engineers to find out where the crack isx_1Dthat can protect the testers from being injured该题您未回答:х 该...
15a), a mean percentage of fine content equal to 15% was assumed in the calibration of the pore water pressure model. A CPTU until 25 m depth from the ground level (Fig. 13b) was carried out close to the recorded station, as reported by Pass (1994) and the results of the test ...