Today I added more than one pre-commissioning checklist (in detail: 13) to the download area. The Word file contains pre-commissioning checklists for the following equipment: Agitator Blower Column Column (packed) Drum / Vessel Fan (air cooled FD) Filter (sand) Heater (fired) Pump (proportio...
Robert Bruce Hey, in Turnaround Management for the Oil, Gas, and Process Industries, 2019 7.8.4 Commissioning and start-up of new plant and equipment New plant and equipment may have been installed during the turnaround. The start-up procedure for any new items would have been drafted before...