PPAP文件提交确认清单 PPAP文件提交确认清单 PPAPDocumentsList SupplierName:供应商名称:***有限公司 Project:项目名称:PartName:零件名称:***产品 ModelYear:车型年份:PartNumber:零件号:DrawingNo.&Version:图纸号及版本:/ No.ofsamplessubmittedforPPAP:提交PPAP的样品数量:3 PPAPSubmissionLevel:PPAP的提交等级:3 ...
PPAP全套表格模板 PPAP文件清单PPAPDocumentsList SupplierName:供应商名称:PartName:零件名称:油箱 PartNumber:零件号:No.ofsamplessubmitted forPPAP:提交PPAP的样品数量:SupplierpromisedPPAP Date:供应商承诺PPAP日期:No.序号 PPAPElementPPAP文件种类 一次性保证计划书PSW1PSWsheet 生产设备清单2productionfacilityBOM 模具...
Have necessary documents/ Operation Instruction/ Inspection Instruction3、人员的培训。Personnel Training4、生产线的建设及调试。Build up and debug production line5、材料/分供方清单得到PE的批准,且完成所有分供方的PPAP批准;一品多点的组合在整车上得到验证。Get PE approval of Material/Subcontractor List and P...
质量 部 9 Customer drawings, specification and any documents of engineering changes 客户图纸、技术规范和工程变更相关的 AQP 项目部 文件 10 Special Characteristic 特殊特性清单list AQP 项目部 11 Packaging Specification包装规范 AQP 项目部 12 Tier II Supplier PPAP Quality Dept.质量 部 15 Checking Aids检...
《生产件批准程序》(PPAP)第四版(英文版) PRODUCTION PART APPROVAL PROCESS (PPAP) FOREWORD TO THE THIRD EDITION The Production Part Approval Process (PPAP) Third Edition was issued to incorporate a number of revisions which include: ?? Use of “auditable” language and a format consistent with QS...
4工程更改文件,如果有Processchangedocuments,ifany 可销售产品的设计记录(图纸)Designrecords(drawings)ofmarketableproducts 5——对于专利部件/详细资料Forpatentedparts/detaileddata ——对于所有其它部件/详细资料Forallotherparts/detaileddata 6顾客工程批准,如果有要求Customerprocessapproval,ifrequired 7设计FMEADFMEA ...
PPAP提交等级英文模板 PPAPsubmissionlevelofthePPAPfile Requirement Level1 SubmissionLevel Level2Level3Level4 1PartSubmissionWarrant(PSW)S S S S 2AppearanceApprovalReport(AAR)S S S S 3DesignRecordandESOLetter R S S * 3.1-forproprietarycomponents/details R R R * 3.2-forallothercomponents/details ...
供应商确保持有最新相关文件,包装方案以包装工程师最终确认为准 Suppliers make sure have latest related documents and confirm with buyer PE; 3.流程 Procedure:供应商提案 Supplier submit → 工厂提案 Plant requirement → 包装评审 Review meeting[PE·MH·ME·IE·SQE·SQM] → MPL 最终确认Confirm → PE...
and the level of documents submitted to the customer. There is a section that asks for "results meeting all drawing and specification requirements: yes/no" refers to the whole package. If there is any deviations the supplier should note on the warrant or inform that PPAP cannot be submitted....
Level Assessment 项目目标、项目申请Projekt goals / project requisition 项目文件夹Project Documents Folder (these included some more Documents) 项目团队Project team 项目计划、关键节点计划Project schedule / milestone plan Gateway清单、报告Gateway Checklist / Gateway Report PSR报告 Project status report APQP...