Multi-level inverter has emerged as an important topology in the area of high-power-medium voltage energy control applications due to its several advantages such as its good harmonic rejection capability, better output voltage with reduced ripple, reduction of voltage ratings of the power ...
Department of Mining and Geological EngineeringSukumar BandopadhyayDepartment of Mining and Geological EngineeringHindawiJournal of Combustion,2012,(2012-04-24)Ganguli, R., Bandopadhyay, S., 2012. Relationship between Particle size distribution of low-rank pulverized coal and power plant performance. J....
2008. Non-impact of particle size distribution on power generation at a pulverized coal power plant burning low rank Alaska coal. Fuel Process. Technol. 89:499-503.Dinesh Malav, Rajive Ganguli, Sridhar Dutta, and Sukumar Bandopadhyay. "Non-impact of particle size distribution on power generation...
In this paper, especially we are studying the load frequency control with variation of power of multi areas interconnected power system by using MATLAB SIMULINK technique.Chandra Mohan KhanSukumar Chandra KonarChandan Kumar Chanda
The reference value of the required reactive power compensation is thereafter calculated using an adaptive proportional-integral (PI) regulator which outperforms the traditional PI controller. The computed reference value is directly applied to the outer control of the rotor side converter (RSC) to ...
The stability of the system can be incorporated by using Karitonov's four polynomials and also compared with the help of root locus, Bode plot and Nyquist diagrams.Chandra Mohan KhanSukumar Chandra KonarChandan Kumar Chanda
It is observed from the literature that the effects of...doi:10.1080/03772063.2017.1391131Krishan, RamVerma, AshuMishra, SukumarIETE Journal of ResearchKrishan R, Mishra AVS. (2017). Design of multimachine power system stabilizers with forecast uncertainties in load/generation. IETE Journal of ...
Furthermore, the proposed scheme requires the optimisation of only one control parameter in each area. Therefore, the scheme gives away the requirement of complex optimisation algorithms.Sharma, DushyantMishra, SukumarIET Generation, Transmission & Distribution (Wiley-Blackwell)...
doi:10.1007/s40031-016-0271-3PriyaNayarBhimSinghSukumarMishraJournal of The Institution of Engineers (India): Series BJournal of The Institution of Engineers (India): Series B
This research work is mainly focused on the impact of calendar variables in day-ahead hourly ELPF for the year 2017 by using data of the previous year 2016. The evaluation criteria are presented with determination of various statistical errors. The performance of each model is analyzed and the...