that equipped with some appropriate techniques, engineers can train themselves to competently look at the instrumentation results to foresee situation that may be regularized during the course of a load test instead of waiting for the specialist tester's report after the completion of the load test....
Of course, settlement assessment relies very much on the results of a static loading test; in particular, on the re- sponse of the pile toe. However, the actual settlement of a piled foundation due to a working load, whether composed of a single pile, a few piles, or a large group ...
Also describes load test procedures and their interpretation and buckling of long, slender piles with and without supported length. The closing chapter presents case histories of prediction and performance of piles and pile groups. Includes numerous solved problems. 展开 ...
Material:Alloy steel or stainless steel load cell;Capacity:10T,60T,70T,100T,150T,200T, 300T,500T,600T,700T,1000T;Accuracy class:C2, C3;rated output:2.0±0.04mV/V;Combined error:≤±0.030 % RO / ≤±0.020 % RO;Zero balance:±1.0 %RO;insulation resista
In a static pile load test, the ultimate capacity is defined as when a rapid movement occurs under constant or slightly increased load. Because of large movements required for a pile to reach plunging mode failure, on most occasions a distinct plunging ultimate load is not obtained in the test...
The results of a comprehensive pile load-test program and observations from field monitoring of helical piles with either a single helix or double helixes installed in oil sand are presented in this paper. Eleven full-scale pile load tes... MF Randolph,AJ Deeks - International Conference on the...
B. Detailed Report Generation After each testing session, the system automatically generates detailed reports. These reports include all the measured parameters, test results, and recommendations for improvement. The reports can be used by charging pile manufacturers and operators to track the performance...
EVDS1000 series double-gun DC charging pile load testing equipment is specially designed for DC charging pile testing, which can greatly facilitate users to test the charging pile, such as factory test, aging, BMS communication test, fault test and so on。
IUXPOWER Professional production AC LOAD BANK丨DC Load Bank丨AC POWER SOURCE丨DC POWER SOURC0E丨400HZ programmable AC / DC power丨Intelligent false load丨-IUXPOWER