PURPOSE: To sharply reduce the working time for drawing out a foundation pile by setting the chucking widths of the chuck of a vibrohammer and the chuck of a spline joint to almost the same width as that of a foundation pile.NUMAKUNAI HIROAKI...
Pile foundation construction drawing examination fees 翻译结果4复制译文编辑译文朗读译文返回顶部 Plan review fees piling 翻译结果5复制译文编辑译文朗读译文返回顶部 Pile foundation examination expense 相关内容 a这个音圈要按他是圆的还是扁的 This voice coil must according to him be round or flat[translate]...
Size:Q235*1800*114;Delivery time:Fastest 5-10 Days;MOQ:50 PCS;Sample:Avaliable;Pipe Thickness:Accept Customized;Feature:Ground Screws Helix Anchor;Drawing Format:AI/DWG/PDF;Name:Screw Foundation Price;Application:Wooden House;Product name:SOEASY HG20 180
Installed strictly according to the drawing's size requirements, in order to ensure the bolts in the concrete pile concrete without offset, in front of the poured concrete foundation, stereotypical Chuck location acc 翻译结果4复制译文编辑译文朗读译文返回顶部 Screw the good experience meets the ...
frame16, a force-resistant flange15, a tuyere flange14moved together upwards and downwards, causing the pile12to move downwardly (when being pressed), or upwardly (when being drawn) in accordance with a specific direction, specific co-ordinates to the designed depth or pressing/drawing force....
Further details and advantages of the present invention are described by means of the specific description hereinafter. In the drawing: FIG. 1ashows a longitudinal section through a proposed drive point along the driving-in direction, FIG. 1bshows a cross-section taken along section line A-A th...
PURPOSE: To sharply reduce the working time for drawing out a foundation pile by setting the chucking widths of the chuck of a vibrohammer and the chuck of a spline joint to almost the same width as that of a foundation pile. ;CONSTITUTION: A hydraulic chuck 7 is arranged at the bottom...
material and the vibration/noise damage to surrounding inhabitants by digging the ground along a casing screw covered on the head section of an existing foundation pile, cutting off the tip section of foundation pile from the foundation consolidation material, then hoisting and drawing the foundation...
material and the vibration/noise damage to surrounding inhabitants by digging the ground along a casing screw covered on the head section of an existing foundation pile, cutting off the tip section of foundation pile from the foundation consolidation material, then hoisting and drawing the foundation...
The foundation pile drawing anchorage device is characterized in that the single-hole anchor rings of the anchorage device are welded with the center sleeve by the ribbed slab, wherein the number of the single-hole anchor rings is equal to the number of foundation pile main reinforcement, and ...