PURPOSE: To sharply reduce the working time for drawing out a foundation pile by setting the chucking widths of the chuck of a vibrohammer and the chuck of a spline joint to almost the same width as that of a foundation pile. ;CONSTITUTION: A hydraulic chuck 7 is arranged at the bottom...
Pile foundation construction drawing examination fees 翻译结果4复制译文编辑译文朗读译文返回顶部 Plan review fees piling 翻译结果5复制译文编辑译文朗读译文返回顶部 Pile foundation examination expense 相关内容 a这个音圈要按他是圆的还是扁的 This voice coil must according to him be round or flat[translate]...
Bolt processed after you experience your quality requirements, install immediately. Installed strictly according to the drawing's size requirements, in order to ensure the bolts in the concrete pile concrete without offset, in front of the poured concrete foundation, stereotypical Chuck location acc ...
The stress strain curves for average and cyclic components of loading can then be established by drawing a horizontal cross-section at τcy/su = 0.4 and a vertical cross-section at τa/su = 0.2 respectively. The cross-section lines intersect with the average or the cyclic strain contour ...
For a further understanding of the nature and objects of the present invention reference should be had to the following description, taken in conjunction with the accompanying drawing in which like parts are given like reference numerals, and wherein: FIG. 1 is a side view of the invention....
PURPOSE: To sharply reduce the working time for drawing out a foundation pile by setting the chucking widths of the chuck of a vibrohammer and the chuck of a spline joint to almost the same width as that of a foundation pile.NUMAKUNAI HIROAKI...
material and the vibration/noise damage to surrounding inhabitants by digging the ground along a casing screw covered on the head section of an existing foundation pile, cutting off the tip section of foundation pile from the foundation consolidation material, then hoisting and drawing the foundation...
The foundation pile drawing anchorage device is characterized in that the single-hole anchor rings of the anchorage device are welded with the center sleeve by the ribbed slab, wherein the number of the single-hole anchor rings is equal to the number of foundation pile main reinforcement, and ...
material and the vibration/noise damage to surrounding inhabitants by digging the ground along a casing screw covered on the head section of an existing foundation pile, cutting off the tip section of foundation pile from the foundation consolidation material, then hoisting and drawing the foundation...
The duct drawing implement is suitable for the foundation-pile underwater concreting construction process; as the accident that the concrete often blocks up the duct due to the concrete mix proportion, the slump and the like, the duct drawing implement is designed for quickly and safely treating ...