[ABAQUS][有限元] 某三桩承台有限元分析 [Finite Element Analysis of Triangular Pile Cap] 实干、实践、积累、思考、创新。 前不久做的某嵌岩桩三桩承台有限元分析,承台比较厚,柱尺寸较大、桩直径较大,柱投影曲线与桩投影曲线部分重叠。对于普通三桩承台,规范主要给出的是梁配筋模式,而对于这个承台,其实从宏...
1) pile cap 桩基承台1. Practical design-calculation method of double-column combined pile cap; 双柱联合桩基承台的实用设计计算方法2. Treatment and Control for the Lateral Deviation of Pile Cap at XinHui Boiler Works; 新会锅炉厂桩基承台侧移的处理和控制...
Figure 1 shows critical section for calculation of bending moment and shear force. The ACI Building Code (ACI 318) [6] uses a sectional approach for the design of pile cap, irrespective of depth, which involves shear and flexural design. The critical section for shear was assumed to be ...
5) cap of single pile 单桩桩帽 6) vertical pile cap 直桩桩帽 1. This paper analyzes the methods of determination of bearing capacity and checking calculation for crack resistance of thevertical pile caps of reinforced concrete and shows the calculation table for the design of thevertical pile ...
1)pile cap承台 1.Controlling measures of crack on pile cap of bridge;桥梁承台大体积混凝土的裂缝控制措施 2.Finite element analysis of effects of pile cap sizes to pile s lateral capacity;承台大小对桩水平承载力影响的有限元分析 3.Calculation of the punching shear bearing capacity of pile caps wi...
2.Influence of pile spacing, pile cap dimension and angle of internal friction of embankment filling on the pile efficacy is analyzed.研究了桩间距、桩帽大小和填料内摩擦角对桩体荷载分担比的影响。 3.Deformation Analysis of Double-row Piles by Finite Element Method双排桩结构特性及桩体位移有限元计算...
1) pile cap 桩基承台板 2) pile foundation 桩基 1. Application of the high strain dynamic inspection method in thepile foundationdetection; 高应变动力测试技术在桩基检测中的应用 2. The application of linear finite element analysis based on m method in the calculation ofpile foundation; ...
The pile cap, built in the form of a truncated pyramid over the piles, is 6 meters high. ParaCrawl Corpus The calculation sheet accelerates and facilitates the design of pile caps and the consideration of constructional constraints. ParaCrawl Corpus 17.01.2013 - Analysis of group of piles (...
2.Talking about Pile Driving Effects into Account,Calculation of Design of Interval Between Piles for Reinforcement of Weak Foundation考虑打桩效应CFG桩加固软基桩间距设计计算 3.Study of Soil Arching Effects of Sheet-pile Wall and Appropriate Space between Piles;桩板墙工程土拱效应及合理桩间距研究 ...
The helmet is a temporary steel cap placed on top of the pile used to, as much as possible, protect the head during driving. Pile Cushion A pile cushion is typically made of wood. It is placed between the helmet and the pile.