The gaze behaviour of the vulnerable road users to the left and right hardly changed over the time and about two thirds of the pedestrians and cyclists were looking in at least one direction before crossing the railway. During the period without the speed bump eleven pedestrians...
行人及单车区标志, 高街, 桑伯里(Pedestrian and Cycle Zone sign, High Street, Thornbury) 摩肯贝道行人及自行车道(Morecambe Road pedestrian and cycle path) 单车及行人隧道入口(Cyclist and Pedestrian Tunnel Entrance) 行人隧道/ 利兹布拉德福德国际机场跑道下的自行车手(Tunnel for pedestrians / cyclists...
It will also implement policy decisions towards a reduction in the number of pedestrian and cyclist ... CO Chennai 被引量: 0发表: 0年 Bicycle lane left of motor vehicle right-turn lane IMPROVEMENTS TO STANDARDIZED FACILITIES These designs differ most notably from bicycle/bus lane design in the...
Ling and Wu (2004)studied cyclist crossing speed at an urban signalized intersection in Beijing, China. Two video cameras were used to monitor left-turn and through cyclist movements. The video frame capture rate (frame frequency) was 25 frames per second. The traversing time was calculated by...
Green Pedestrian and Cyclist Way for Sustainable Campus: Case Study at Universiti Tun Hussein Onn Malaysia In order to encourage students or staff using the walkways as pedestrian and cycling as a mode of trip made inside the campus, the design and layout of the... MS Yusof,Z Said,AWA Zaki...
The main objective of this paper is to quantify pedestrian and cyclist impacts on a turbo-roundabout corridor level. The study has two major purposes: 1) to evaluate the impact of several pedestrian and cyclists demands on corridor traffic performance and pollutant emissions; 2) to examine the ...
Pedestrian-cyclist Interactions at Bus Stops along Segregated Bike Paths: A Case Study of Montreal Afghari, A.P. et al., 2014. Pedestrian-cyclist Interactions at Bus Stops along Segregated Bike Paths: A Case Study of Montreal. In Transportation Research Board 93rd Annual Meeting.Afghari, A.P...
(c) an at-gradepedestrian crossingacross the junction of Fleming Road and the re-aligned Hung Hing Road to the Wan Chai waterfront legco.gov.hk legco.gov.hk (c) 由菲林明道及重新定線的鴻興道交界處,伸延至灣仔 海旁的地面行人過路處 ...
13. In addition, this street will host the tram, a road, and cyclist and pedestrian walkways. 此外,这条街将举办电车,公路,以及自行车和行人。 14. Go past the pedestrian bridge, you will see that the museum is on your left 走过那人行天桥,你就会看到那个博物馆在你的左边 ...
Summary Pedestrian scramble phasing is usually implemented to reduce pedestrian-vehicle conflicts and therefore increase the safety of the intersection. Ho... H Hediyeh,T Sayed,MH Zaki - 《Journal of Advanced Transportation》 被引量: 10发表: 2015年 The Behavior Analysis of Pedestrian-cyclist Interact...