A paving slab mould (1) comprises an open-topped an open-bottomed frame (2) having side walls (3) with means (5, 6) to permit detachable connection of the frame 2 to at least one further frame of the same form so as to permit a plurality of paving slabs to be cast simultaneously ...
Normally 30 days after receipt of deposit and moulds confirmation from Buyer. 5.What about the payment? 30% as down deposit by T/T ,70% as the balance paid by T/T before loading(L/C is also acceptable). 6.Does the price include the mould? Yes,the above price...