A method for separating a short, in order to form endless film grinding belt, a film parts of a film strip to be drawn off from the supply reel and for scraping off the film layer at the point of separationKRAUSPE WILLY
Standard export package,suit for all kinds of transport,or as required. MOQ 500 Kg Container Size 20ft GP:5898mm(Length)x2352mm(Width)x2393mm(High) 40ft GP:12032mm(Length)x2352mm(Width)x2393mm(High) 40ft HC:12032mm(Length)x2352mm(Width)x2698mm(High) Application Brass...
Product Application of two high rolling mill machine for wire rod,tmt bar making 1. Final product: 5.5-12mm wire rod, 8-32mm rebar, 40-120mm round bar,strip steel etc; 2. Raw material: steel scrap or billet (billet section size:60*60mm,80*80mm,100*100mm,120*120mm,130*130mm...
5. Anti-rust particles can penetrate into every corner of the package, so as to achieve a better anti-rust effect. Precautions for use: 1. Before packing with anti-rust materials, the metal products must be cleaned, dried or blown dry. It is recommended that the op...
5. Accuracy: The precision of design size of cutting section can reach 0.005-0.001mm.6. Quality Control System: Every Department has independent self-calibration system, advanced laboratory and testing equipment provided for a full range of reliable physica...
HYT is a manufacturer specializing in steel exporting business for 8 years. HYT main steel products include plate, sheet, coil, strip, bar, pipe, tube, etc. made of stainless steel, carbon steel and alloy steel. 2,How long is HYT steel pipe delivery time? lt takes around 3-5 days f...
A:30% deposit by TT and balance settled before shipping or against BL copy.And LC is also acceptable. Q5:What's the quality level of your product? A:Our product are 100% quality checked.The quality are totally according to clients' requirements.And we have many kinds of quality ce...
In 2018, the company was restructured and introduced 10 extrusion production lines (600 tons-3,500 tons), a fully automatic oxidation electrophoresis production line, vertical and horizontal Type spraying production line, as well as a variety of advanced production supporting, processing ...
Max loading weight for every order to save cost for all of us. FAQ 1.Q:How long for the cutting dies and received sample? A: Depend on the size of dies, gernerally speaking, 7-10 days for die cutting, 3days-5days sampling after die ready. ...
First, welding technology advantages: the welding technology of thin-walled copper-aluminum pipes suitable for industrialized production is known as a world-class problem and is the key technology for replacing copper with aluminum for connecting pipes of air conditioner...