In use, the base is mounted over the trench at the desired location for the padmount transformer. The cables are then secured to the base, and the trench is backfilled with the base being grounded. Afterwards, the cables are released from the base and attached to the padmount transformer....
amc for replacement of installed failed converter transformer 298.6 mva (including dismantling) by spare converter transformer (298.6 mva) of either pole-1 or pole-2 in case of failute at hvdc terminal station, padghe Download Tender Document / BOQ You May Also Check padghe Tenders AMC, Re...