Thats not bad, same out as in I like it. I scaled the above up with a second electrolizer and was eventually able to push 2kg/s through the pipes constantly, using a bit of overflow baffling and redirecting it worked perfectly. You guys have truly taught me well. The problem was that...
We can pipe water from the ends of the earth-like asteroid to the base but it needs to be sitting out in an open pool for the Dupes to go gather it. Why not a machine with a water inlet that allows Dupes to gather water without having to go trekking all over or risking open air...
When the buffer fills up, the liquid continues through the other, bridge, the overflow: Similarly how polluted water prevented the buffer to put water in the pipe, now the water from overflow block the valve with polluted water to keep adding packets of polluted water that was blocking the ...
the heat extracted from the gas/liquid is add to the building itself which can then heat the surroundings. They reduce the temperature of the gas/liquid going through by 14°C, whatever the content of the pipe is. In terms of energy, as defined above, we can calculate the heat removed ...
You could just have the pipe contine from the turbine return vent and take the excess water out of the system. At 1000kg/tile having to wait a bit for coolant won't make much difference in temperatures. And the "oops some oil got on that vent" trick works if you need to continue ...
So you're saying that in the zig zag design, every time you drop down to the next floor, you are wasting 3 cells of space where the petrol is not in contact with the pipe because it is an inter dimentional drip, and the waterfall eliminates that? mathmanican Registered Users 2.2k ...
Are they really not producing anything or just alternating on/off? Also, what kind of packets are you sending? Full packets every other second would fill the pipe immediately. It was alternating packets of water. Some packets are full, some were not. The electrolyzers were toggling on and of...
hot into cold situation - things appear to be behaving normally, or maybe not, I'll just have to pay more attention. The geyser has a tendency to overflow the room, this is why I stuck a mesh tile in on the left and just started dumping the overflow - I couldn't use it fast ...
pipe 260 to vertical overflow pipe 264, to overflow the open end 265 of overflow pipe 264. The holes 263 in the stand-pipe are preferably not sufficient to carry the entire volume of water being introduced into the system 200 by the reservoir supply pipe 220 and/or geo-thermal well 240....
If it is considered undesirable for bubbles to be entrained in the flow through the outflow pipe 18, a de-bubbling section 56 can be provided. Surface flow into this section from the eductor tube nearest it is preferably prevented by baffle 51, whether or not provided elsewhere. In de-...