Therefore, they should function throughout the lifetime of the ITER without repair. For example, a double interturn insulation is used in the PFC sections. It consists of two insulation layers separated with a thin-grounded metallic insert. Such a design allows fixing leakage currents that ...
The deviations that occur in the sampling phase are corrected in the key generation phase and a secret bit string is formed. The key verification phase is responsible for ensuring correct key agreement. The error correction property of the proposed protocol is able to defend the effects resulting...
This allowed the capability of using the same system model definition, with different interchangeable TBM models (HCLL and HCPB) to conduct thermal hydraulics studies. For each test, a full nodalization of the ITER system was implemented into the TBM simulations utilizing an external coupling ...
This suggests that the loss of particles because of a ripple of the ITER toroidal field is due mostly to the ripple fundamental mode. To sum it up, the algorithm and its software implementation comprise an effective tool for the MS optimisation. An extensive practical experience has been gained...
This quick overview of the ITER tokamak gives an idea of the technological challenges that the ITER designers and engineers have had to face—and are still facing. Some of these challenges are not completely new as they have already been tackled in other tokamaks. But at ITER, the size and...