Mould filler with casing for concrete - has casing bottom aperture closable by swivelable flap with pivot axis outsideMould pourer uses a fill hopper having a sealable bottom outlet. The bottom outlet (13) is sealed by a swivel bottom flap (14, 15) pivoting round an axis (18, 19) to ...
This invention is related to a concrete wall production method with on-site casting The invention is particularly related to a method where the external facade of the building is formed together with the production of walls by placing th... OZSUT, MUSTAFA 被引量: 0发表: 2017年 ...
Research of the Process of Shaping Folded Filler of Sandwich Panels from Cardboard Sandwich panels with the corrugated filler made of composite cardboard are used in building constructions, road sound dampening screens, etc. Taking into a... Il'dus,Zakirov,Alexandr,... - 《American Journal of ...
Burrows in cracked or broken sidewalks may need to be filled with metal filler and cement. Pest control professionals may fill active burrows with things to kill the rats inside, such as natural rodenticides or dry ice, before closing them. Dry ice in particular is very effective for outdoor ...
For new or old exterior surface of brickwork, plaster, and concrete, etc. Features: 1.Dirt resistance 2.Excellent alkali, fungus & algae resistance 3.Weathering resistance & color retention 4. Strong adhesion Where to Use Suitable for the protection & decotation of house, hotel,offic...
a对于解决这个问题你有没有什么具体的建议 Regarding solves this problem you to have any concrete suggestion[translate] ahome is sweet 家是甜的[translate] alancome tonique douceur lancome tonique douceur[translate] aThese moving 移动的这些[translate] ...
高品质215 * 135毫米塑料手柄低密度橡胶砌体浮子抹灰浮子全新产品砖石工具镜面抛光抹泥刀不锈钢抹灰抹泥刀,用于带塑料手柄的混凝土美国市场热卖灰泥完成工具海绵抹灰抹泥刀与木柄不锈钢内外拉角机墙壁腻子工具内外拉角机拉角机塑料刮刀比萨饼刮刀厨房刮刀KAKU砌砖抹灰混凝土抹刀工具,带双色塑料橡胶手柄干墙角工具套装2...
and heat-resistant steel with a sleek neutral finish that blends in nicely with its surroundings. lava rocks come with this pit to serve as a helpful filler for your heated space. take note: the tank holder and the propane tank itself are sold separately). batteries are required (and ...
The edges 52 and 53 of the plates 5 are mutually connected and a water- stop filler 8 is packed into the coupled portion and hardened. Concrete 10 is then placed into the trench 1. Groundwater can thus be exactly stopped on the outside of a continuous underground wall, and the ...
The edges 52 and 53 of the plates 5 are mutually connected and a water- stop filler 8 is packed into the coupled portion and hardened. Concrete 10 is then placed into the trench 1. Groundwater can thus be exactly stopped on the outside of a continuous underground wall, and the ...