The rig was slated to work off Equatorial Guinea into Q3 for Ophir, generating $49 million in backlog, after which it will undergo a 10-year special survey in the Canary Islands, then move to West Africa in Q4 for another $75 million in backlog with African Petroleum until its Ireland ...
Similarly, the heat in the bounding strata (U-, L-shale) can only flow conductively and be exploited when the advectively flowing fluid in the sandstone drops below the original temperature. Another issue in a natural, unbounded reservoir is that flow is not constrained by lateral no-flow ...