https://www.neccontract.com/news/covid-19-compensation-events-under-ecc-–-an-nec-users’-perspective Recent news 17 January 2025 Construction starts on £6.3 bn of NEC contracts in Belgium After two years of enabling works, permanent construction has now started on the €7.5 billion (...
“changes”and“compensationevent” Themainprovisionsrelatingtocompensation eventsaresetoutinSection6oftheEngineering& ConstructionContract(ECC) UnderECC,changesisapackageoftimeand moneyi.e.foreverycompensationevent,theeffects ontheprogrammeandcontractsum(Prices)are ...
1.工程施工合同(Engineering and Construction Contract)——通常说的都是这个ECC主合同 2. 工程施工分包合同 (Engineering and Construction Subcontract) 3. 专业服务合同 (Professional Service Contract) 4. 供应合同 (Supply Contract) 5. 争议解决服务合同 (Dispute Resolution Service Contract) 6. 设计建造运营合...
Compensation events entitle a contractor to be compensated for any impact the event has on the prices, completion or key dates in the contract. The cost impact of a compensation event is based upon the effect the event has on the cost of work already done and the forecast cost of work ...
这一指导思想在NEC系列合同中的工程施工合同(EngineeringandConstructionContract,简称ECC合同)核心条款第一条作了明确规定:“雇主、承包商、项目经理和监理工程师应按本合同的规定,在工作中互相信任、相互合作。裁决人应按本合同的规定独立工作。”而且,这一指导思想贯穿于所有合同条件中,特别反映在如“早期警告”...
It is commonplace that the contractor does not forecast those impacts of a Compensation Event correctly. For example, I have witnessed the following scenario multiple times: contractor’s CE001 = 10 days delay forecast[9]. CE002 = 5 days delay forecast. CE003 = 20 days delay forecast. The...
contract is not a compensation event. 13.8 项目经理可以不认可承包商提交的函件。以 本合同规定的理由不认可承包商提交的函件不属 于补偿事件。 (在工程施工合同中的许多情况下,项目经理必须 认可或拒绝由承包商提交的建议文件。) NEC(newengineering contract——新工程合同)裁决程序 1)早期预警程序 早期预警是指...
23、ceptance 认可,notification 通知, recipient 收信人(接受者),communication函件, submit/resubmit 提交/再次提交,due 到期,withhold 扣留、保留;拒绝给予,compensation event补偿事件,12.1 In this contract, except where the context shows otherwise, words in the singular also mean in the plural and the ot...
34、inthiscontractisnotacompensationevent.13.8 项目目经理可可以不认认可承包包商提交交的函件件。以本本合同规规定的理理由不认认可承包包商提交交的函件件不属于于补偿事事件。(在工程程施工合合同中的的许多情情况下,项目经经理必须须认可或或拒绝由由承包商商提交的的建议文文件。)NEC(newengineeringcontract新新...
Withholding acceptance for a reason stated in this contract is not a compensation event. 项目经理可以不认可承包商提交的函件。以本合同规定的理由不认可承包商提交的函件不属于补偿事件。 (在工程施工合同中的许多情况下,项目经理必须认可或拒绝由承包商提交的建议文件。) NEC(new engineering contract——...