The first step is to create a ring beam of concrete and steel. It can be a simple, circular foundation, a slab on grade floor with an integrated ring, or a tall stem wall with the ring beam seamlessly integrated near the top. Vertical steel reinforcing bars, or rebar, are embedded in...
Side Joint Treatment: Method 2 - Locate on the concrete topping slab where the precast joints are below. Apply membrane, 125 mils (3.2mm) thick, over this area. Center a strip of reinforcing (Flex-Flash F or Flex-Flash UN), 2 X the slab thickness plus 6" (152.4mm) in width, over...